Filtrer vos résultats
- 13
- 7
- 15
- 5
- 19
- 2
- 1
- 2
- 2
- 2
- 7
- 1
- 3
- 3
- 16
- 4
- 18
- 14
- 3
- 2
- 1
- 1
- 20
- 8
- 4
- 4
- 3
- 3
- 3
- 2
- 2
- 2
- 2
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
20 résultats
|
|
triés par
|
|
Reconfigurable Digitalized and Servitized Production Systems: Requirements and ChallengesIFIP International Conference on Advances in Production Management Systems (APMS), Aug 2020, Novi Sad, Serbia. pp.501-508, ⟨10.1007/978-3-030-57997-5_58⟩
Communication dans un congrès
emse-02925983v1
|
||
|
Bi-objective optimisation approaches to Job-shop problem with power requirementsExpert Systems with Applications, 2020, 162, pp.113753. ⟨10.1016/j.eswa.2020.113753⟩
Article dans une revue
hal-03003304v1
|
||
|
Toward Scheduling for Reconfigurable Manufacturing SystemsIFAC-PapersOnLine, 2020, 21st IFAC World Congress, 53 (2), pp.10443-10448. ⟨10.1016/j.ifacol.2020.12.2786⟩
Article dans une revue
emse-03051560v1
|
||
MES (logiciels de digitalisation des ateliers) et Excellence Opérationnelle 4.0GOFab ! Manufacturing du futur, Oct 2022, Saint-Etienne, France
Communication dans un congrès
emse-03845086v1
|
|||
|
The Group Shop Scheduling Problem with power requirements17th International Workshop on Project Management and Scheduling (PMS 2020/2021), Apr 2021, Toulouse, France
Communication dans un congrès
emse-03208622v1
|
||
An effective multi-start multi-level evolutionary local search for the flexible job-shop problemEng. Appl. of AI, 2017, 62, pp.80--95. ⟨10.1016/j.engappai.2017.04.002⟩
Article dans une revue
hal-02086246v1
|
|||
An Optimization Approach for Job-shop with Financial Constraints - In the Context of Supply Chain Scheduling Considering Payment Delay between MembersICORES 2015 - Proceedings of the International Conference on Operations Research and Enterprise Systems, 2015, Lisbon, Portugal. pp.190--198
Communication dans un congrès
hal-02086247v1
|
|||
|
Energy-aware scheduling in reconfigurable multiple path shop floors53rd CIRP Conference on Manufacturing Systems, Jul 2020, Chicago, France. pp.1007 - 1012, ⟨10.1016/j.procir.2020.04.020⟩
Communication dans un congrès
hal-03048138v1
|
||
|
Job-Shop like Manufacturing System with Time Dependent Energy Threshold and Operations with Peak ConsumptionIFIP International Conference on Advances in Production Management Systems (APMS), Sep 2015, Tokyo, Japan. pp.617-624, ⟨10.1007/978-3-319-22756-6_75⟩
Communication dans un congrès
hal-01417625v1
|
||
|
Line Balancing and Sequencing for Peak Power MinimizationIFAC-PapersOnLine, 2020, 21st IFAC World Congress, 53 (2), pp.10411-10416. ⟨10.1016/j.ifacol.2020.12.2781⟩
Article dans une revue
emse-03051544v1
|
||
|
An Optimization Framework for Job-shop with Energy Threshold Issue With consideration of machining operations with consumption peaks7th Multidisciplinary International Conference on Scheduling : Theory and Applications (MISTA 2015), Aug 2015, Prague, Czech Republic
Communication dans un congrès
hal-03556368v1
|
||
|
Design and planning of configurations in RMS to minimize the energy cost facing uncertain demandInternational Working Seminar on Production Economics 2022 (IWSPE), Feb 2022, online, Innsbruck, Austria. 14p
Communication dans un congrès
emse-03593575v1
|
||
|
A Conjunctive-disjunctive Graph Modeling Approach for Job-Shop Scheduling Problem with Changing Modes17th International Workshop on Project Management and Scheduling (PMS 2020/2021), Apr 2021, Toulouse, France
Communication dans un congrès
emse-03208586v1
|
||
Intégration du Rest Allowance dans l’ordonnancement d’ateliers de types Job-shop20ème Congrès annuel de la société française de Recherche Opérationnelle et d'Aide à la Décision (ROADEF), Feb 2019, Le Havre, France
Communication dans un congrès
emse-02050644v1
|
|||
Modélisation des problèmes d'ateliers reconfigurablesCongrès annuel de la société Française de Recherche Opérationnelle et d’Aide à la Décision (ROADEF 2020), Feb 2020, Montpellier, France
Communication dans un congrès
hal-02477070v1
|
|||
Reactive Flexible Job Shop Problem with Stress Level ConsiderationAdvances in Production Management Systems. Production Management Systems for Responsible Manufacturing, Service, and Logistics Futures IFIP WG 5.7 International Conference, APMS 2023, Sep 2023, Trondheim, Norway. pp.632-646, ⟨10.1007/978-3-031-43670-3_44⟩
Communication dans un congrès
emse-04209553v1
|
|||
Job-shop like manufacturing system with variable power threshold and operations with power requirementsInternational Journal of Production Research, 2017, 55 (20), pp.6011-6032. ⟨10.1080/00207543.2017.1321801⟩
Article dans une revue
hal-03003290v1
|
|||
|
Modelling Flexible Manufacturing Systems with Power Constraints and Machine Switch on/off7th International Conference on Industrial Engineering and Systems Management (IESM 2017), Oct 2017, Sarrebruck, Germany
Communication dans un congrès
hal-03557593v1
|
||
|
Affectation et Ordonnancement énergétiquement efficient pour le problème de flow shop hybride multi-lignes24ème édition du congrès annuel de la Société Française de Recherche Opérationnelle et d'Aide à la Décision ROADEF 2023, Feb 2023, Rennes, France
Communication dans un congrès
emse-04021669v1
|
||
|
Balancing and Configuration Planning of RMS to Minimize Energy CostIFIP International Conference on Advances in Production Management Systems (APMS), Aug 2020, Novi Sad, Serbia. pp.518-526, ⟨10.1007/978-3-030-57997-5_60⟩
Communication dans un congrès
emse-02925990v1
|