Recherche - Archive ouverte HAL Accéder directement au contenu

Filtrer vos résultats

117 résultats

Minimizing the weighted sum of machine completion times in flowshop with time lags

Julien Fondrevelle , Ammar Oulamara , Marie-Claude Portmann
International Conference on Industrial Engineering and Systems Management - IESM'05, I4e2, May 2005, Marrakech/Maroc
Communication dans un congrès inria-00000148v1

Using clustering method to solve Two Echelon Multi-products Location-Routing problem with Pickup and Delivery

Younes Rahmani , Ammar Oulamara , Wahiba Ramdane Cherif- Khettaf
3rd International Conference on Operations Research and Enterprise Systems, Mar 2014, Angers, France
Communication dans un congrès hal-01307469v1
Image document

Vehicle Routing Problem with Mixed fleet of conventional and heterogenous electric vehicles and time dependent charging costs

Ons Sassi , Wahiba Ramdane Cherif , Ammar Oulamara
2014
Pré-publication, Document de travail hal-01083966v1
Image document

Scheduling hybrid flowshop with parallel batching machines and compatibilities.

Adrien Bellanger , Ammar Oulamara
Computers and Operations Research, 2008, 36 (6), pp.1982-1992. ⟨10.1016/j.cor.2008.06.011⟩
Article dans une revue inria-00582858v1

Electric Bus Scheduling and Optimal Charging

Bilal Messaoudi , Ammar Oulamara
International Conference on Computational Logistics ICCL 2019: Computational Logistics, pp.233-247, 2019, ⟨10.1007/978-3-030-31140-7_15⟩
Chapitre d'ouvrage hal-02981785v1

Scheduling: Agreement graph vs resource constraints

Ammar Oulamara , Mohamed Bendraouche , Mourad Boudhar
European Journal of Operational Research, 2015, 240 (2), pp.355-360. ⟨10.1016/j.ejor.2014.07.003⟩
Article dans une revue hal-02990780v1

Iterated Tabu Search for the Mix Fleet Vehicle Routing Problem with Heterogenous Electric Vehicles

Ons Sassi , Wahiba Ramdane Cherif-Khettaf , Ammar Oulamara
Advances in Intelligent Systems and Computing, Springer, Cham, 359, , pp.57-68, 2015, In: Le Thi H., Pham Dinh T., Nguyen N. (eds) Modelling, Computation and Optimization in Information Systems and Management Sciences, 978-3-319-18161-5. ⟨10.1007/978-3-319-18161-5_6⟩
Chapitre d'ouvrage hal-02982821v1

ROADEF'09 - Livre des resumés

Ammar Oulamara , Marie-Claude Portmann
Oulamara, Ammar and Portmann, Marie-Claude. Press INPL, pp.407, 2009
Ouvrages inria-00607333v1

Permutation flowshop scheduling problems with time lags to minimize the weighted sum of machine completion times

Julien Fondrevelle , Ammar Oulamara , Marie-Claude Portmann
International Journal of Production Economics, 2008, 112 (1), pp.168-176. ⟨10.1016/j.ijpe.2006.08.018⟩
Article dans une revue istex hal-00235174v1

Makespan minimization in a no-wait flow shop problem with two batching machines

Ammar Oulamara
Computers and Operations Research, 2007, 34 (4), pp.1033--1050. ⟨10.1016/j.cor.2005.05.028⟩
Article dans une revue istex inria-00595610v1
Image document

Approche de résolution pour les problèmes de flowshop avec time-lags minimaux et maximaux

Julien Fondrevelle , Ammar Oulamara , Marie-Claude Portmann
6ème Congrès de la Société Française de Recherche Opérationnelle et d'Aide à la Décision ROADEF'05, Laboratoire d'Informatique de l'Université de Tours, Feb 2005, Tours/France
Communication dans un congrès inria-00001211v1

No-wait flow shop problem with two mixed batching machines

Ammar Oulamara
Third Conference on Management and Control of Production and Logistics - MCPL'2004, 2004, Santiago, Chilie, 6 p
Communication dans un congrès inria-00108089v1

Multi-Start Iterated Local Search for the Mixed fleet Vehicle Routing Problem with Heterogeneous Electric Vehicles

Ons Sassi , Wahiba Ramdane Cherif- Khettaf , Ammar Oulamara
Evolutionary Computation in Combinatorial Optimization, 9026, Springer, pp.138-149, 2015, 978-3-319-16467-0. ⟨10.1007/978-3-319-16468-7_12⟩
Chapitre d'ouvrage hal-01306896v1

Dynamic programming approach for minimizing the transportation costs in a supply chain

Zerouk Mouloua , Ammar Oulamara
4th IFAC Conference on Management and Control of Production and Logistics - MCPL'2007, IFAC, Sep 2007, Sibiu, Romania. pp.753-758, ⟨10.3182/20070927-4-RO-3905.00124⟩
Communication dans un congrès inria-00596014v1

problème de Localisation-Routage Multi-produits avec collecte et livraison

Younes Rahmani , Ammar Oulamara , Wahiba Ramdane Cherif-Khettaf
ROADEF, Feb 2013, Troyes, France
Communication dans un congrès hal-01307676v1

Scheduling two identical parallel machines with preparation constraints

Wafaa Labbi , Mourad Boudhar , Ammar Oulamara
International Journal of Production Research, 2014, 55 (6), pp.1531-1548. ⟨10.1080/00207543.2014.978032⟩
Article dans une revue hal-03047069v1

On the Complexity and Approximabiliy of the Fixed Interval Scheduling Problem with Energy Constraints

Ons Sassi , Ammar Oulamara
The 2015 IFAC Symposium on Information Control in Manufacturing, May 2015, Ottawa, Canada
Communication dans un congrès hal-01308401v1

Minimizing the Number of Machines in the Fixed Interval Scheduling Problem with Energy Constraints

Ons Sassi , Ammar Oulamara
Fourth International Conference on Industrial Engineering and Operations Management - IEOM 2015, Mar 2015, Dubai, United Arab Emirates
Communication dans un congrès hal-01308406v1

Joint Scheduling and Optimal Charging of Electric Vehicles Problem

Ons Sassi , Ammar Oulamara
The 14th International Conference on Computational Science and Its Applications (ICCSA 2014), Jun 2014, Guimaraes, Portugal
Communication dans un congrès hal-01308410v1

Simultaneous Electric Vehicles Scheduling and Optimal Charging in the Business Context: Case Study

Ons Sassi , Ammar Oulamara
The 5th Hybrid and Electric Vehicle Conference - HEVC 2014, Nov 2014, Londres, United Kingdom
Communication dans un congrès hal-01308412v1

Role assignment in round-trip ride-sharing problem with relay stations

Kamel Aissat , Ammar Oulamara
2016
Pré-publication, Document de travail hal-01307952v1

Planification conjointe des tournées et de la recharge des véhicules électriques

Ons Sassi , Ammar Oulamara , Wahiba Ramdane Cherif-Khettaf , A Roset , M Serairi , et al.
ROADEF, Feb 2013, Troyes, France
Communication dans un congrès hal-01307682v1

Minimizing total completion time on a batching machine with job processing time compatibilities

Adrien Bellanger , Ammar Oulamara , Mikhail Y. Kovalyov
Electronic Notes in Discrete Mathematics, 2010, 36, pp.1295--1302. ⟨10.1016/j.endm.2010.05.164⟩
Article dans une revue istex hal-00595669v1
Image document

Multi-objective resources allocation approaches for workflow applications in Cloud environments

Kahina Bessai , Samir Youcef , Ammar Oulamara , Claude Godart , Selmin Nurcan
OnTheMove Federated Conferences & Workshops, Sep 2012, Rome, Italy
Communication dans un congrès hal-00751216v1

Constructive Heuristics for Periodic Electric Vehicle Routing Problem

Tayeb Oulad Kouider , Wahiba Ramdane Cherif-Khettaf , Ammar Oulamara
7th International Conference on Operations Research and Enterprise Systems, Jan 2018, Funchal, Portugal. pp.264-271, ⟨10.5220/0006630502640271⟩
Communication dans un congrès hal-02982813v1

Maximizing the Number of Served Requests in an Online Shared Transport System by Solving a Dynamic DARP

Sven Vallée , Ammar Oulamara , Wahiba Ramdane Cherif-Khettaf
Bektaş T.; Coniglio S.; Martinez-Sykora A.; Voß S. Computational Logistics 8th International Conference, 10572, springer, pp.64-78, 2017, ⟨10.1007/978-3-319-68496-3_5⟩
Chapitre d'ouvrage hal-02982809v1

Multi-products Location-Routing problem with Pickup and Delivery

Younes Rahmani , Ammar Oulamara , Wahiba Ramdane Cherif
ICALT - International Conference on Advanced Logistics and Transport - 2013, May 2013, Sousse, Tunisia. pp.115-122, ⟨10.1109/ICAdLT.2013.6568445⟩
Communication dans un congrès hal-00841498v1
Image document

Scheduling Hybrid Flowshop with Parallel Batching Machines and Task Compatibilities

Adrien Bellanger , Ammar Oulamara
Models and Algorithms for Planning and Scheduling Problems - MAPSP'07, Jul 2007, Istambul, Turkey
Communication dans un congrès inria-00175217v1

Scheduling preemptive jobs on parallel machines with a conflict graph: a graph multi-colouring approach

Adlane Baaziz , Hacène Ait Haddadène , Ammar Oulamara , Ahmed Kouider
International Journal of Mathematics in Operational Research, 2023, 25 (1), pp.47-67. ⟨10.1504/IJMOR.2023.131397⟩
Article dans une revue hal-04511503v1

ROADEF'09 - Livre des articles

Ammar Oulamara , Marie-Claude Portmann
Oulamara, Ammar and Portmann, Marie-Claude. Press INPL, pp.107, 2009
Ouvrages inria-00607335v1