Alexandre Dolgui
Professeur Alexandre Dolgui, FIISE, HDR, Dr, Ing.
30%
Libre accès
925
Documents
Affiliations actuelles
- 481355
Identifiants chercheurs
- alexandre-dolgui
- ResearcherId : K-1688-2013
- 0000-0003-0527-4716
- Google Scholar : https://scholar.google.fr/citations?user=74xSJb0AAAAJ&hl=fr
- IdRef : 060796138
- ResearcherId : http://www.researcherid.com/rid/K-1688-2013
Site web
- https://www.imt-atlantique.fr/fr/personne/alexandre-dolgui
Présentation
Dr. Alexandre Dolgui is a Fellow of IISE, Distinguished Professor (Full Professor of Exceptional Class in France), and the Head of Automation, Production and Computer Sciences Department at the IMT Atlantique, campus in Nantes, France. His research focuses on manufacturing line design, production planning and supply chain optimization. His main results are based on the exact mathematical programming methods and their intelligent coupling with heuristics and metaheuristics algorithms. He is the co-author of **5** books, the co-editor of **32** books or conference proceedings, the author of **320** refereed papers in international journals, **32** editorials and **32** book chapters as well as over **400** papers in conference proceedings. He is the *Editor-in-Chief* of the International Journal of Production Research, an *Area Editor* of Computers & Industrial Engineering, and an *Associate Editor* of Journal Européen des Systèmes Automatisés, past Associate Editor of International Journal of Systems Science (2005-2008), IEEE Transactions on Industrial Informatics (2006-2009) and Omega-the International Journal of Management Science (2009-2012), consulting Editor of the International Journal of Systems Science (2009- ). He is *Member of the Editorial Boards* for **27** other journals, including the International Journal of Production Economics, International Journal of Manufacturing Technology & Management, International Journal of Simulation & Process Modelling, International Journal of Engineering Management & Economics, Journal of Decision Systems, Journal of Mathematical Modelling & Algorithms,Journal of Industrial Engineering and Management & Production Engineering Review, Decision Making in Manufacturing and Service, Risk and Decision Analysis, etc. *Fellow of the European Academy for Industrial Management*, *Member of the Board of the International Foundation for Production Research*, former *Chair of IFAC TC 5.2 Manufacturing Modelling for Management and Control*, *Member of IFIP WG 5.7* *Advances in Production Management Systems*, *IEEE System Council Analytics and Risk Technical Committee,* *IEEE SMC Technical Committee on Social and Economic Security,* Guest editor of special issues of European Journal of Operational Research, International Journal of Production Research, International Journal of Production Economics, Omega – The International Journal of Management Science, Journal of Intelligent Manufacturing, Journal of Mathematical Modeling and Algorithms, and Annual Reviews in Control, etc.; he was General Scientific Chair of the 12th IFAC symposium INCOM'06 and the 10th IFAC conference MIM'2022, Chairman of International Program Committee of SCM’02, MOSIM’04, INCOM'09, INCOM'12, IESM'13, MIM'13, INCOM'15, MIM'19, and APMS'2021, Chairman of Organizing Committee of the International Conference MOSIM’01 and ROADEF'2011; last ten years, he was Member of Program Committees of over **200** International Conferences, etc. He has been responsible of the French national CNRS working group on Design of Production Systems (with about **336** individual members) and the regional project on Design and Management of Reconfigurable Manufacturing Systems.He has been team leader in 5 European Projects and Coordinator of 1 European Project. Many direct funding projects with industry as well as via the French National Agency for Scientific Research (ANR) and regional research agencies in France.
Domaines de recherche
Informatique [cs]
Automatique
Recherche opérationnelle [math.OC]
Compétences
Assembly line balancing
Assembly and machining line design
Buffer allocation
Planning and scheduling
Combinatorial optimisation
Robust optimisation
Mixed integer programming
Stochastic programming
Production research
Optimisation
Publications
- 45
- 31
- 23
- 20
- 16
- 15
- 15
- 13
- 13
- 13
- 12
- 12
- 12
- 11
- 11
- 11
- 10
- 9
- 9
- 9
- 8
- 8
- 8
- 8
- 8
- 7
- 7
- 7
- 7
- 6
- 6
- 6
- 6
- 6
- 6
- 6
- 6
- 6
- 6
- 6
- 5
- 5
- 5
- 5
- 5
- 5
- 5
- 5
- 5
- 5
- 5
- 5
- 5
- 5
- 4
- 4
- 4
- 4
- 4
- 4
- 4
- 4
- 4
- 4
- 4
- 4
- 4
- 4
- 4
- 4
- 4
- 4
- 4
- 4
- 4
- 4
- 4
- 4
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 149
- 91
- 50
- 50
- 46
- 43
- 41
- 37
- 37
- 35
- 32
- 29
- 28
- 28
- 25
- 25
- 24
- 24
- 23
- 22
- 21
- 19
- 19
- 19
- 16
- 16
- 15
- 15
- 15
- 15
- 14
- 13
- 12
- 11
- 11
- 11
- 10
- 10
- 10
- 10
- 9
- 9
- 9
- 9
- 9
- 9
- 9
- 8
- 8
- 8
- 8
- 7
- 7
- 7
- 7
- 7
- 7
- 7
- 7
- 7
- 7
- 7
- 7
- 7
- 6
- 6
- 6
- 6
- 6
- 6
- 6
- 5
- 5
- 5
- 5
- 5
- 5
- 5
- 5
- 5
- 5
- 5
- 4
- 4
- 4
- 4
- 4
- 4
- 4
- 4
- 4
- 4
- 4
- 4
- 4
- 4
- 4
- 4
- 4
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 89
- 26
- 17
- 15
- 15
- 11
- 10
- 10
- 7
- 6
- 6
- 6
- 5
- 5
- 4
- 4
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 3
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 9
- 46
- 53
- 26
- 41
- 38
- 43
- 30
- 43
- 33
- 53
- 64
- 59
- 30
- 47
- 55
- 45
- 37
- 55
- 50
- 26
- 24
- 12
- 3
- 1
- 1
- 1
- 286
- 184
- 129
- 279
- 117
- 111
- 107
- 96
- 59
- 40
- 39
- 35
- 19
- 13
- 9
- 7
- 4
- 2
- 1
- 1
A literature review of optimization problems focused on scalability aspects for manufacturing systems25th Congress of the French Society of Operations Research and Decision Aid (ROADEF 2024), Mar 2024, Amiens, France
Communication dans un congrès
hal-04451795v1
|
|
A hyper-volume based metric for scalable design of reconfigurable manufacturing systems with multiple objectives2nd Congress of the Society of Automatics, Industrial Engineering and Production (SAGIP 2024), May 2024, Villeubanne, France
Communication dans un congrès
hal-04531398v1
|
|
Stochastic optimization for multi-echelons multi-items capacitated lot-sizing problem under uncertain demand and capacity disruptionsODSIE 2023, Nov 2023, Istanbul, Turkey
Communication dans un congrès
hal-04418616v1
|
|
Presentation of the International Journal of Production Research (IJPR)2023 POMS international conference, Rennes School of Business, Jul 2023, Paris, France
Communication dans un congrès
hal-04418349v1
|
|
ASSISTANT – Learning and robust decision support systems for agile manufacturing environmentsHere.We.Go - The Future Industry Forum of the French-German Academy of the Industry of the Future, Oct 2023, Munich, Germany
Communication dans un congrès
hal-04418364v1
|
|
Optimization and AI are key components of the industry of the futureICSIF 2023 Conference, Rabat, Marocco, October 24,, Oct 2023, Rabat, Morocco
Communication dans un congrès
hal-04418399v1
|
|
Stochastic Optimization Methodology for Production Planning with Uncertain Demand and Lead Time Based on The Digital TwinSEMIT 2023, Sep 2023, Ankara, Turkey
Communication dans un congrès
hal-04418624v1
|
|
Combinatorial optimization for preliminary design of machiningsystems: advanced methods and applicationsIEEE IRASET conference, ENSET Mohammedia, May 2023, Mohammedia, Morocco
Communication dans un congrès
hal-04418389v1
|
|
AI in Manufacturing: Example of a Large European Project ASSISTANTScience, Engineering Management and Information Technology (SEMIT 2023), September 14, 2023, Sep 2023, Ankara, Turkey
Communication dans un congrès
hal-04418330v1
|
|
Simulated annealing for a bi-objective-based scalable balancing of a reconfigurable assembly line under uncertainty and limited resources50th International Conference on Computers & Industrial Engineering (CIE50), Oct 2023, Sharjah, United Arab Emirates
Communication dans un congrès
hal-04199608v1
|
|
LeArning and robuSt deciSIon SupporT systems for agile mANufacTuring environments (ASSISTANT)The 20th IEEE International Conference on Networking, Sensing and Control, IEEE, Oct 2023, Marseille, France
Communication dans un congrès
hal-04418376v1
|
|
An overall presentation of the project ASSISTANTEFFRA Manufacturing Partenership Day, European Commission, Sep 2023, Bruxelles, Belgium
Communication dans un congrès
hal-04418413v1
|
|
Focus on the European project ASSISTANT (Horizon 2020)AIAMMS 2023, JECRC University, Nov 2023, Jaipur, India
Communication dans un congrès
hal-04418419v1
|
|
ASSISTANT: LeArning and robuSt deciSIon SupporT systems for agile mANufacTuring environments (H2020)8th IEEE Symposium on Analitics and Risk (ARTC 2023), Chinese Academy of Sciences, Jul 2023, Pekin, China
Communication dans un congrès
hal-04418429v1
|
|
|
Apprentissage de contraintes : résumé et application sur un problème de planificationROADEF 2023 : 24ème congrès annuel de la Société Française de Recherche Opérationnelle et d'Aide à la Décision, Feb 2023, Rennes, France
Communication dans un congrès
hal-04074975v1
|
Learning capacity consumption in multi-level capacitated lot-sizing problemsInternational Workshop on Lot-Sizing-IWLS’2023, Aug 2023, Cork (Irlande), Ireland
Communication dans un congrès
hal-04420932v1
|
|
|
Markov decision process for dynamic task assignment in mixed-model assembly lines under processes time uncertainty with moving workers and portable equipmentROADEF 2023: 24th annual congress of the French Society for Operational Research and Decision Support, Feb 2023, Rennes (Campus de Beaulieu), France
Communication dans un congrès
hal-04420175v1
|
Managing Process Time Uncertainty in Mixed-Model Assembly Lines2023 POMS international conference, Jul 2023, Paris, France
Communication dans un congrès
hal-04420218v1
|
|
Presentation of the International Journal of Production ResearchIFIP APMS Production Management Systems for Responsible Manufacturing, Service and Logistics Future, NTNU, Sep 2023, Trondheim, Norway
Communication dans un congrès
hal-04418442v1
|
|
Replenishment planning in supply chains under uncertainties of component lead timesSeminar of Hestim, Hestim, May 2023, Casablanca, Morocco
Communication dans un congrès
hal-04418396v1
|
|
|
Stochastic approaches for multi-echelon disassembly lot-sizing under random lead timesCIE50 Proceedings, American University of Sharjah, Oct 2023, Sharjah, United Arab Emirates
Communication dans un congrès
hal-04292083v1
|
Models and Methods for Balancing Machining Lines Composed of Rotary Transfer MachinesInternational Conference on Information Technologies in Industry, Logistics and the Social Sphere, Sep 2023, Minsk, Belarus. pp.181-184
Communication dans un congrès
hal-04418371v1
|
|
|
Planification multi-période, multi-sourcing d'approvisionnements avec délais stochastiques, prix dégressifs et coûts de flexibilité de livraisonROADEF 2023 : 24ème congrès annuel de la Société Française de Recherche Opérationnelle et d'Aide à la Décision, Rennes School of Business, Feb 2023, Rennes, France
Communication dans un congrès
hal-04006494v1
|
AI based robust decision support systems in manufacturing: The European project ASSISTANT2023 EDSI Annual Conference, Decision Science Institute, USA, Jun 2023, Nantes, France
Communication dans un congrès
hal-04418448v1
|
|
|
Resource-constrained balancing of assembly lines to optimize their productivity and robustness in a reconfigurable environment24th Congress of the French Society of Operations Research and Decision Aid (ROADEF 2023), Rennes School of Business; IMT Atlantique; Université Rennes 1, Feb 2023, Rennes, France
Communication dans un congrès
hal-03998121v1
|
|
Robust inventory management under joint demand and lead time uncertaintyROADEF 2023 : 24ème congrès annuel de la Société Française de Recherche Opérationnelle et d'Aide à la Décision, Rennes School of Business, Feb 2023, Rennes, France
Communication dans un congrès
hal-04011259v1
|
Keynote talk at Webinar in Hong Kong. Presentation of the European project Assistant - The ASSISTANT project: AI for high level decision in manufactuingSystems Analytics Global Leaders' Seminars - https://www.saleaders.hku.hk/, Jan 2022, Hong Kong, China
Communication dans un congrès
hal-03982359v1
|
|
|
Predicting makespan in Flexible Job Shop Scheduling Problem using Machine LearningMIM 2022: 10th IFAC Conference on Manufacturing Modelling, Management and Control, Jun 2022, Nantes, France. ⟨10.1016/j.ifacol.2022.09.305⟩
Communication dans un congrès
hal-03832204v1
|
|
Supply planning and inventory control under lead time uncertainty: a literature review and future directionsMIM 2022: 10th IFAC Conference on Manufacturing Modelling, Management and Control, Jun 2022, Nantes, France. ⟨10.1016/j.ifacol.2022.10.138⟩
Communication dans un congrès
hal-03709647v1
|
|
Mixed-Model Assembly Line Design with New Product Variants in Production GenerationsMIM 2022: 10th IFAC Conference on Manufacturing Modelling, Management and Control, Jun 2022, Nantes, France. pp.25-30, ⟨10.1016/j.ifacol.2022.09.363⟩
Communication dans un congrès
hal-03928973v1
|
Keynote talk on Replenishment planning in supply chains under uncertainties of component lead timesIEOM 2022: 5th European IEOM Rome Conference, IEOM society, Jul 2022, Rome, Italy
Communication dans un congrès
hal-03982303v1
|
|
Une approche basée sur l'agrégation des scénarios pour résoudre un problème de planification de désassemblage sous incertitude des délais de remise à neufROADEF 2022 : 23ème congrès annuel de la Société Française de Recherche Opérationnelle et d'Aide à la Décision, INSA Lyon, Feb 2022, Villeurbanne - Lyon, France
Communication dans un congrès
hal-03596245v1
|
|
|
Approximation d'un ensemble d'incertitude pour l'optimisation robuste dirigée par les donnéesROADEF 2022 : 23ème congrès annuel de la Société Française de Recherche Opérationnelle et d'Aide à la Décision, INSA Lyon, Feb 2022, Villeurbanne - Lyon, France
Communication dans un congrès
hal-03596172v1
|
|
FPTASes for Scheduling a Distributed Flow-shop of Maximizing Total Early Work (awarded as the best paper)CMCT2022: 39th Workshop on Combinatorial Mathematics and Computation Theory, Taiwan, Jun 2022, Taipei, Taiwan
Communication dans un congrès
hal-03982287v1
|
MIP based heurictics for Batch Machining at Rotary Transfer MachinesIWSPE 2022: 22nd International Working Seminar on Production Economics, IJPE, Feb 2022, Innsbruck, Austria. 16 p
Communication dans un congrès
hal-03982347v1
|
|
|
Two-stage stochastic program for disassembly lot-sizing under random ordering lead timeMIM 2022: 10th IFAC Conference on Manufacturing Modelling, Management and Control, IMT Atlantique, Nantes, Jun 2022, Nantes, France. ⟨10.1016/j.ifacol.2022.09.580⟩
Communication dans un congrès
hal-03709633v1
|
|
Apprentissage automatique de contraintes pour des problèmes de planification de productionROADEF 2022 : 23ème congrès annuel de la Société Française de Recherche Opérationnelle et d'Aide à la Décision, INSA Lyon, Feb 2022, Villeurbanne - Lyon, France
Communication dans un congrès
hal-03596171v1
|
|
On Local Optima Distribution in Buffer Allocation Problem for Production Line with Unreliable MachinesMIM 2022: 10th IFAC Conference on Manufacturing Modelling, Management and Control, Jun 2022, Nantes, France. pp.1092-1097, ⟨10.1016/j.ifacol.2022.09.535⟩
Communication dans un congrès
hal-03982130v1
|
|
Un problème de planification de désassemblage sous incertitude de rendementROADEF 2022 : 23ème congrès annuel de la Société Française de Recherche Opérationnelle et d'Aide à la Décision, INSA Lyon, Feb 2022, Villeurbanne - Lyon, France
Communication dans un congrès
hal-03595435v1
|
|
Simulation and Optimisation of a Failure-Prone Disassembly-Reconditioning-Assembly SystemMIM 2022 - 10th IFAC Conference on Manufacturing Modelling, Management and Control, Jun 2022, Nantes, France. ⟨10.1016/j.ifacol.2022.09.653⟩
Communication dans un congrès
hal-03709643v1
|
|
Improving the Tractability of SVC-based Robust OptimizationMIM 2022: 10th IFAC Conference on Manufacturing Modelling, Management and Control, Jun 2022, Nantes, France. pp.719 - 724, ⟨10.1016/j.ifacol.2022.09.492⟩
Communication dans un congrès
hal-03832914v2
|
|
Using Knowledge Graphs and Human-Centric Artificial Intelligence for Reconfigurable Supply Chains: A Research FrameworkMIM 2022: 10th IFAC Conference on Manufacturing Modelling, Management and Control, Jun 2022, Nantes, France. pp.1693-1698, ⟨10.1016/j.ifacol.2022.09.641⟩
Communication dans un congrès
hal-03982239v1
|
|
Integrated simulation-optimization modeling framework of resilient design and planning of supply chain networksMIM 2022: 10th IFAC Conference on Manufacturing Modelling, Management and Control, Jun 2022, Nantes, France. pp.2713-2718, ⟨10.1016/j.ifacol.2022.10.121⟩
Communication dans un congrès
hal-03982135v1
|
|
An extended MILP formulation for the design of modular multi-model reconfigurable manufacturing linesROADEF 2022: 23rd Congress of the French Society of Operations Research and Decision Aid, Feb 2022, Villeurbanne, France
Communication dans un congrès
hal-03595241v1
|
|
A MILP-based heuristic approach for the design of multi-product modular reconfigurable lines10th IFAC Conference on Manufacturing Modeling, Management and Control (MIM 2022), Jun 2022, Nantes, France. ⟨10.1016/j.ifacol.2022.09.570⟩
Communication dans un congrès
hal-03702256v1
|
IISE Transactions best paper award 2021: A control approach to scheduling flexibly configurable jobs with dynamic structural-logical constraintsIISE Annual 2022, Seattle, May 21-24, 2022, IISE, May 2022, Seatle, United States
Communication dans un congrès
hal-03982326v1
|
|
An Automated Smart Production with System Reliability Under a Leader-Follower Strategy of Supply Chain ManagementAPMS 2022: IFIP International Conference on Advances in Production Management Systems, Sep 2022, Gyeongju, South Korea. pp.459-467, ⟨10.1007/978-3-031-16407-1_54⟩
Communication dans un congrès
hal-03981929v1
|
|
Search space reduction in MILP approaches for the robust balancing of transfer lines17th International Workshop on Project Management and Scheduling (PMS 2020/2021), Apr 2021, Toulouse, France
Communication dans un congrès
hal-03206497v1
|
|
Modular equipment optimization in the design of multi-product reconfigurable manufacturing systems17th International Workshop on Project Management and Scheduling (PMS 2020/2021), Apr 2021, Toulouse, France
Communication dans un congrès
hal-03206499v1
|
|
|
Optimization for Lot-Sizing Problems Under Uncertainty: A Data-Driven PerspectiveIFIP International Conference on Advances in Production Management Systems (APMS), Sep 2021, Nantes, France. pp.703 - 709, ⟨10.1007/978-3-030-85902-2_75⟩
Communication dans un congrès
hal-03337325v2
|
|
ASSISTANT: Learning and Robust Decision Support System for Agile Manufacturing EnvironmentsINCOM 2021: 17th IFAC Symposium on Information Control Problems in Manufacturing, Jun 2021, Budapest, Hungary. pp.641-646, ⟨10.1016/j.ifacol.2021.08.074⟩
Communication dans un congrès
hal-03486945v2
|
|
The adaptive robust lot-sizing problem with backorders under demand uncertainty2021 IEEE International Conference on Automation Science and Engineering (CASE), Aug 2021, Lyon, France. ⟨10.1109/CASE49439.2021.9551425⟩
Communication dans un congrès
hal-03375198v1
|
|
A robust data driven approach to supply planning.APMS 2021: IFIP International Conference on Advances in Production Management Systems, IMT Atlantique, Sep 2021, Nantes, France. pp.169-178, ⟨10.1007/978-3-030-85910-7_18⟩
Communication dans un congrès
hal-03545577v1
|
|
A MILP-based heuristic for minimizing the number of reassignments under balancing multi-model reconfigurable manufacturing lines22nd Congress of the French Society of Operations Research and Decision Aid (ROADEF 2021), Apr 2021, Mulhouse (on-line), France
Communication dans un congrès
hal-03214189v1
|
|
Multi-period Multi-sourcing Supply Planning with Stochastic Lead-Times, Quantity-Dependent Pricing, and Delivery Flexibility CostsAPMS 2021: IFIP International Conference on Advances in Production Management Systems, IFIP WG 5.7 International Conference, Sep 2021, Nantes, France. pp.511-518, ⟨10.1007/978-3-030-85874-2_54⟩
Communication dans un congrès
hal-03852861v2
|
|
Économie circulaire sous incertitude des délais : Revue de la littératureConférence Internationale Génie Industriel QUALITA 2021 (CIGI 2021), May 2021, Grenoble, France
Communication dans un congrès
hal-03255312v1
|
|
Advancing Circular Economy: Research Roadmap for Circular Integrated Production Systems22nd Working Conference on Virtual Enterprises (PRO-VE 2021), Nov 2021, Saint-Etienne, France. pp.789-796, ⟨10.1007/978-3-030-85969-5_75⟩
Communication dans un congrès
emse-03350984v1
|
|
Mathematical Model for Processing Multiple Parts on Multi-positional Reconfigurable Machines with TurretsIFIP International Conference on Advances in Production Management Systems (APMS), Sep 2021, Nantes, France. pp.563-573, ⟨10.1007/978-3-030-85902-2_60⟩
Communication dans un congrès
hal-04117663v1
|
Balancing multi-model assembly lines in a reconfigurable environment31th European Conference on Operational Research (EURO 2021), Jul 2021, Athens, Greece
Communication dans un congrès
hal-03285500v1
|
|
|
Integrated Workforce Allocation and Scheduling in a Reconfigurable Manufacturing System Considering Cloud ManufacturingIFIP International Conference on Advances in Production Management Systems (APMS), Sep 2021, Nantes, France. pp.535-543, ⟨10.1007/978-3-030-85902-2_57⟩
Communication dans un congrès
hal-04117630v1
|
|
A Model for a Multi-level Disassembly System Under Random Disassembly Lead TimesAPMS 2021: IFIP International Conference on Advances in Production Management Systems, IFIP WG 5.7 International Conference, Sep 2021, Nantes, France. pp.39-47, ⟨10.1007/978-3-030-85874-2_5⟩
Communication dans un congrès
hal-03852879v1
|
|
Digital Twin Framework for Reconfigurable Manufacturing Systems: Challenges and RequirementsAPMS 2021: Advances in Production Management Systems. Artificial Intelligence for Sustainable and Resilient Production Systems, Sep 2021, Nantes, France. pp.553-562, ⟨10.1007/978-3-030-85902-2_59⟩
Communication dans un congrès
hal-03632245v2
|
|
A Digital Twin-Driven Methodology for Material Resource Planning Under UncertaintiesIFIP International Conference on Advances in Production Management Systems, Sep 2021, Nantes, France. pp.321-329, ⟨10.1007/978-3-030-85874-2_34⟩
Communication dans un congrès
hal-03337298v1
|
|
Designing Bioenergy Supply Chains Under Social ConstraintsAPMS 2021: IFIP International Conference on Advances in Production Management Systems, Sep 2021, Nantes, France. pp.387-396, ⟨10.1007/978-3-030-85874-2_41⟩
Communication dans un congrès
hal-04030398v1
|
|
A Digital Twin Modular Framework for Reconfigurable Manufacturing SystemsAPMS 2020: Advances in Production Management Systems. Towards Smart and Digital Manufacturing, Aug 2020, Novi Sad, Serbia. pp.493-500, ⟨10.1007/978-3-030-57997-5_57⟩
Communication dans un congrès
hal-02923302v1
|
|
Diagnosis on Energy and Sustainability of Reconfigurable Manufacturing System (RMS) Design: A Bi-level Decomposition Approach2020 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM), Dec 2020, Singapour, Singapore. ⟨10.1109/IEEM45057.2020.9309742⟩
Communication dans un congrès
hal-03131857v1
|
|
Multi-period Multi-item Lot sizing under Random Yield and Stochastic Capacity13th International Conference on Modeling, Optimization and Simuation - MOSIM'20, Nov 2020, Agadir (en ligne), Morocco
Communication dans un congrès
hal-03052909v1
|
|
Optimizing task reassignments in the design of reconfigurable manufacturing lines21st Congress of the French Society of Operations Research and Decision Aid (ROADEF 2020), Feb 2020, Montpellier, France
Communication dans un congrès
hal-02485673v1
|
|
Minimizing task reassignments in the design of reconfigurable manufacturing lines with space restrictions21st IFAC World Congress, Jul 2020, Berlin, Germany. ⟨10.1016/j.ifacol.2020.12.2785⟩
Communication dans un congrès
hal-03202342v1
|
|
Résolution du problème de bin-packing robuste par un algorithme de branch-and-price21e Congrès Annuel de la Société Française de Recherche Opérationnelle et d’Aide à la Décision (ROADEF 2020), Feb 2020, Montpellier, France
Communication dans un congrès
hal-02485676v1
|
|
A Newsboy formulae to optimize planned lead times for two-level disassembly systems21st IFAC World Congress, Jul 2020, Berlin, Germany. pp.10816-10821, ⟨10.1016/j.ifacol.2020.12.2867⟩
Communication dans un congrès
hal-03200253v1
|
|
Modélisation et optimisation du problème de planification de type RMRPMOSIM'20 : 13eme Conference Francophone de Modelisation, Optimisation et Simulation, Nov 2020, Agadir, Maroc
Communication dans un congrès
hal-03171078v1
|
|
The Impact of Dynamic Tasks Assignment in Paced Mixed-Model Assembly Line with Moving WorkersAPMS 2020: Advances in Production Management Systems. Towards Smart and Digital Manufacturing, Aug 2020, Novi Sad, Serbia. pp.509-517, ⟨10.1007/978-3-030-57997-5_59⟩
Communication dans un congrès
hal-02923306v1
|
Multi-period supply planning problem under a dynamic demand, stochastic lead times and a supplier selection21st International Working Seminar on Production Economics, Hubert Missbauer, Ou Tang, Feb 2020, Innsbrück, Austria
Communication dans un congrès
hal-02635840v1
|
|
|
Newsboy problem with two-level disassembly system and stochastic lead timeCongrès Annuel de la Société Française de Recherche Opérationnelle et d'Aide à la Décision (ROADEF 2020), Mar 2020, Montpellier, France
Communication dans un congrès
hal-02612213v1
|
|
A Stochastic Model for a Two-Level Disassembly Lot-Sizing Problem Under Random Lead TimeIFIP International Conference on Advances in Production Management Systems (APMS), Aug 2020, Novi Sad, Serbia. pp.275-283, ⟨10.1007/978-3-030-57993-7_32⟩
Communication dans un congrès
hal-02923308v1
|
MIP Models for optimal batch machining at flow lines with reconfigurable stationary machines10th International Conference on IT in Industry, Logistics and Social domain (ITI’2019), Мinsk, Belarus, May 23–24, May 2019, Minsk, Belarus
Communication dans un congrès
hal-02435988v1
|
|
Mathematical model for dynamic suppliers’ selection strategy in multi-period supply planning with lead-times uncertainty9th IFAC Conference on Manufacturing Modelling, Management and Control MIM 2019, Aug 2019, Berlin (Germany), Germany. pp.1040-1044, ⟨10.1016/j.ifacol.2019.11.332⟩
Communication dans un congrès
hal-02435985v1
|
|
ForewordIFAC-PapersOnLine, 2019, new york, United States
Communication dans un congrès
hal-03625444v1
|
|
|
Decision Support System for Joint Product Design and Reconfiguration of Production SystemsIFIP International Conference on Advances in Production Management Systems (APMS), Sep 2019, Austin, TX, United States. pp.231-238, ⟨10.1007/978-3-030-30000-5⟩
Communication dans un congrès
hal-02355032v1
|
A literature review of optimization problems for reconfigurable manufacturing systems9th IFAC Conference on Manufacturing Modeling, Management and Control (MIM 2019), Aug 2019, Berlin, Germany. ⟨10.1016/j.ifacol.2019.11.097⟩
Communication dans un congrès
hal-02273360v1
|
|
Scenario-based stochastic linear programming model for multi-period disassembly lot-sizing problems under random lead timePart of special issue: 9th IFAC Conference on Manufacturing Modelling, Management and Control MIM 2019, Aug 2019, Berlin, Germany. pp.595-600, ⟨10.1016/j.ifacol.2019.11.224⟩
Communication dans un congrès
hal-02435984v1
|
|
Gestion des réapprovisionnements en composants pour les systèmes d'assemblage sous incertitudes des délais de livraisonSeminaire invité FORAC et CIRRELT, Université Laval, Oct 2018, Québec, Canada
Communication dans un congrès
hal-01979459v1
|
|
Optimization of output and manufacturing intensities for batch processing of multiple products on multi-position transfer line under uncertainty of demandeLogistics Analitics: Euro mini-conference, Jun 2018, Minsk, Belarus
Communication dans un congrès
hal-01979445v1
|
|
Replenishment planning in supply chains under uncertainties (invited keynote plenary talk)CIE48 2018 : The 48th International Conference on Computers & Industrial Engineering, The University of Auckland, Dec 2018, Auckland, New Zealand
Communication dans un congrès
hal-01979016v1
|
|
Production planning problem with dynamic demand and stochastic lead times8th International conference "Tanaev's Readings 2018", United Institute of Informatics Problems of the National Academy of Sciences of Belarus (UIIP), Institute of Mathematics of the National Academy of Sciences of Belarus (IM), Belarusian State University (BSU), Mar 2018, Minsk, Belarus. pp.192-196
Communication dans un congrès
hal-01961239v1
|
|
|
Enhanced MILP approach for maximizing the robustness of paced transfer lines with uncertain parallel tasks and fixed number of machines19th Congress of the French Society of Operations Research and Decision Aid (ROADEF 2018), Feb 2018, Lorient, France
Communication dans un congrès
hal-01713722v1
|
Replenishment planning for assembly to order systems under uncertainty of component lead times (invited plenary keynote talk)LMSCM 2018 : The 16th Int. Logistics and Supply Chain Congress, Oct 2018, Denizli, Turkey
Communication dans un congrès
hal-01979396v1
|
|
55th anniversary of Production Research: An invited plenary talkICPR International Conference on Production Research, Jul 2018, Poznan, Poland
Communication dans un congrès
hal-01697344v1
|
|
Replenishment planning for assembly to order systems under uncertainty of component lead timesInvited Seminar, Bandung Institute of Technology, Nov 2018, Bandung, Indonesia
Communication dans un congrès
hal-01979462v1
|
|
Replenishement planning for two-level assembly systems under stochastic lead times: exact methods and methaheuristicsLogistics Analitics: Euro mini-conference, Jun 2018, Minsk, Belarus
Communication dans un congrès
hal-02006367v1
|
|
Workforce planning for cyclic production of multiple parts on a paced lineProceedings of the 8th International conference “Tanaev's Readings 2018”, Mar 2018, Minsk, Belarus. pp.197-199
Communication dans un congrès
hal-01979435v1
|
|
Optimisation d'un plan de production multi-périodes avec une demande dynamique et des délais stochastiques.MOSIM 2018 : 12th International Conference on Modeling, Optimization and SIMulation, Jun 2018, Toulouse, France. pp.415-422
Communication dans un congrès
hal-01977432v1
|
|
Optimality-based cuts generation for robust balancing of paced production lines with blocks of uncertain parallel tasks and space restrictions29th European Conference on Operational Research (EURO 2018), Jul 2018, Valencia, Spain
Communication dans un congrès
hal-01832920v1
|
|
An optimal workforce assignment problem for a paced assembly line at the line design stage29th European Conference on Operational Research (EURO-2018), Jul 2018, Valencia, Spain
Communication dans un congrès
hal-01979441v1
|
|
Combinatorial techniques to optimally customize machining/assembly lines (Invited plenary talk)Optimization Problems and Their Applications, OPTA 2018, 7th International Conference, Omsk, Russia, 8-14 July 2018, Jul 2018, Omsk, Russia
Communication dans un congrès
hal-01977582v1
|
|
Control Theory Applications to Operations Systems, Supply Chain Management and Industry 4.0 NetworksINCOM 2018 : 16th IFAC Symposium on Information Control Problems in Manufacturing, Jun 2018, Bergamo, Italy. pp.1536-1541, ⟨10.1016/j.ifacol.2018.08.279⟩
Communication dans un congrès
hal-01979423v1
|
|
Invited presentation of International Journal of Production ResearchThe 19th Asia Pacific Conference on Industrial Engineering and Management Systems (APIEMS 2018), Hong Kong, 5-8 December 2018, Dec 2018, Hong Kong, China
Communication dans un congrès
hal-01979013v1
|
|
Optimization of multi-period production planning under stochastic lead times and a dynamic demandPreprints of the 20th International Working Seminar on Production Economics, Grubbström, R.W, Hinterhuber, H.H., Lundquist, J. (Eds), Feb 2018, Innsbruck, Austria. pp.55-66
Communication dans un congrès
hal-01734711v1
|
|
MIP approach for batch machining at flow lines with stationary machinesProceedings of the 8th International conference “Tanaev's Readings 2018”, Mar 2018, Minsk, Belarus. pp.187-191
Communication dans un congrès
hal-01979433v1
|
|
Conception de systèmes de production reconfigurables/flexiblesColloque systèmes de production du futur, Oct 2018, Paris, France
Communication dans un congrès
hal-01979455v1
|
|
Combinatorial design of paced production lines in machining environment (invited plenary keynote talk)The XIX Congress of the Portuguese Association of Operational Research, Sep 2018, Aveiro, Portugal
Communication dans un congrès
hal-01979391v1
|
|
Combinatorial design of machining lines: new optimization problems and techniques (invited plenary keynote talk)14th International Industrial Engineering Conference, Feb 2018, Teheran, Iran
Communication dans un congrès
hal-01979019v1
|
|
55th anniversary of Production Research (IJPR): An invited plenary talk24th International Conference on Production Research (ICPR 24), Jul 2017, Poznan, Poland
Communication dans un congrès
hal-01688882v1
|
|
Some new ideas for assembly line balancing researchIFAC World Congress, Jul 2017, Toulouse, France. pp.2255 - 2259, ⟨10.1016/j.ifacol.2017.08.189⟩
Communication dans un congrès
hal-01687968v1
|
|
Retailer Supply Networks: An analysis and research perspective18th Asia Pacific Industrial Engineering and Management System Conference, Dec 2017, Yogyakarta, Indonesia. pp.D1-6 to D1-11
Communication dans un congrès
hal-01688937v1
|
|
Truck scheduling at a cross-dock with repackaging24th International Conference on Production Research, Jul 2017, Poznan, Poland
Communication dans un congrès
emse-01689360v1
|
|
Combinatorial design of machining lines18th Asia Pacific Industrial Engineering and Management System Conference 2017 (APIEMS 2017), Dec 2017, Yogyakarta, Indonesia
Communication dans un congrès
hal-01688876v1
|
|
Identification and simulation models in logistics control systems for production processes and freightingIFAC World Congress, Jul 2017, Toulouse, France. pp.14638 - 14643, ⟨10.1016/j.ifacol.2017.08.1903⟩
Communication dans un congrès
hal-01687960v1
|
|
|
A Dynamic Approach to Multi-stage Job Shop Scheduling in an Industry 4.0-Based Flexible Assembly SystemIFIP International Conference on Advances in Production Management Systems (APMS), Sep 2017, Hamburg, Germany. pp.475-482, ⟨10.1007/978-3-319-66923-6_56⟩
Communication dans un congrès
hal-01666225v1
|
Random lead times in replenishment planning for single-level assembly systems: The value of informationIFAC Wold Congress, Jul 2017, Toulouse, France. pp.1205 - 1210, ⟨10.1016/j.ifacol.2017.08.343⟩
Communication dans un congrès
hal-01687966v1
|
|
|
A MILP approach for robust transfer line design7th International Conference on Industrial Engineering and Systems Management (IESM 2017), Oct 2017, Saarbrücken, Germany
Communication dans un congrès
hal-01614455v1
|
|
Supply planning optimization for linear production system with stochastic lead-times and quality controlInternational Conference on Industrial Engineering and Systems Management (IESM 2017), Oct 2017, Sarrebruck, Germany
Communication dans un congrès
hal-01627085v1
|
|
Robust scheduling of assembly lines with and without parallel workstations18th Congress of the French Society of Operations Research and Decision Aid (ROADEF 2017), Feb 2017, Metz, France
Communication dans un congrès
hal-01474542v1
|
Optimisation of processing conditions for multi-product batch production lines with series-parallel operations under uncertainty on demands for finished products18th Asia Pacific Industrial Engineering and Management System Conference, Dec 2017, Yogyakarta, Indonesia. pp. A2-7 to A2-12
Communication dans un congrès
hal-01688932v1
|
|
Methods of Optimization for Aggregation and Execution Modes of Steps for Multi-positional Batch ProcessingThe international conference IT in Production, Logistics and Social Sphere, May 2017, Minsk, Belarus
Communication dans un congrès
hal-01688942v1
|
|
A branch-and-price algorithm for robust bin packing with variable size itemsJoint EURO/ORSC/ECCO Conference 2017 on Combinatorial Optimization (ECCO XXX – 2017), May 2017, Koper, Slovenia
Communication dans un congrès
hal-01518356v1
|
|
Stochastic collection-disassembly problem with sample average approximation24th International Conference on Production Research (ICPR 24), Jul 2017, Poznan, Poland
Communication dans un congrès
hal-01688908v1
|
|
IJPR (International Journal of Production Research) is celebrating its 55th anniversaryIntrenational Conference on Industrial Engineering and Systems Management, Oct 2017, Saarbrücken, Germany
Communication dans un congrès
hal-01688894v1
|
|
Optimal control representation of the mathematical programming model for supply chain dynamic reconfigurationIFAC World Congress, Jul 2017, Toulouse, France. pp.4994 - 4999, ⟨10.1016/j.ifacol.2017.08.900⟩
Communication dans un congrès
hal-01687963v1
|
|
Workforce planning for cyclic production of multiple partsIWDSP, Adam Mickiewicz University, Jun 2016, Poznan, Poland. pp.45-48
Communication dans un congrès
hal-01435918v1
|
|
General Parametric Scheme for the Uniform Scheduling Problem with Two Different SpeedsCSIST’2016, Belarusian State University, Oct 2016, Minsk, Belarus. pp.1083-1086
Communication dans un congrès
hal-01435913v1
|
|
Optimization of the Structure and Execution Modes of Intersecting Operation Sets8th IFAC Conference on Manufacturing Modelling, Management and Control, MIM 2016, Jun 2016, Troyes, France. pp.105-110
Communication dans un congrès
hal-01435894v1
|
|
On multiobjective buffer allocation problem in production line"Tanaev’s Readings”, Mar 2016, Minsk, Belarus. pp.67-71
Communication dans un congrès
hal-01435916v1
|
|
FOREWORDIFAC PAPERSONLINE, 8th IFAC Conference on Manufacturing Modelling, Management and Control (MIM), Troyes, FRANCE, 2016, Troyes, France
Communication dans un congrès
hal-03625439v1
|
|
Disruptions in supply chains and recovery policies: state-of-the art review8th IFAC Conference on Manufacturing Modelling, Management and Control, MIM 2016, Jun 2016, Troyes, France. pp.21436-1441
Communication dans un congrès
hal-01435898v1
|
|
Heuristics for Batch Machining at Reconfigurable Rotary Transfer Machines8th IFAC Conference on Manufacturing Modelling, Management and Control, MIM 2016, Jun 2016, Troyes, France. pp.491-496
Communication dans un congrès
hal-01435904v1
|
|
Prise en compte des incertitudes pour une conception efficace d'une ligne de désassemblage17e Congrès de la société française de recherche opérationnelle et aide à la décision, ROADEF’2016, Feb 2016, Compiègne, France
Communication dans un congrès
hal-01313344v1
|
|
Design of a Multi-agent System to Manage Relay Intercity Freighting8th IFAC Conference on Manufacturing Modelling, Management and Control, MIM 2016, Jun 2016, Troyes, France. pp.1656-1661
Communication dans un congrès
hal-01435902v1
|
|
Scheduling of inbound truck arrivals and shop-floor operation in a cross-dock platform, based on outbound trucks loading planNineteenth International Working Seminar on Production Economics, Feb 2016, Innsbruck, Austria. pp 323-332
Communication dans un congrès
emse-01444385v1
|
|
Genetic algorithm for the synthesis of process plans for group parallel machining on reconfigurable unit-head machines“Tanaev’s Readings”, Mar 2016, Minsk, Belarus. pp.45-49
Communication dans un congrès
hal-01435915v1
|
|
MIP-based heuristics for Batch Machining at Rotary Transfer MachinesCSIST’2016, Oct 2016, Minsk, Belarus. pp.1091-1096
Communication dans un congrès
hal-01435914v1
|
|
Combinatorial Design of Machines and Machining Lines – New Application Domain for OR5th International Conference on Operations Research and Entreprise Systems (ICORES 2016), Feb 2016, Rome, Italy
Communication dans un congrès
hal-01313337v1
|
|
Line design and balancing problems in machining environmentWorkshop “ALBP 60 years later: State-of-the-art and Future developments roadmap”, Nov 2015, Toulouse, France
Communication dans un congrès
hal-01313340v1
|
|
Ripple Effect in the Time-Critical Food Supply Chains and Recovery Policies15th IFAC Symposium on Information Control Problems in Manufacturing — INCOM 2015, May 2015, Ottawa, Canada. pp.Pages 1682-1687, ⟨10.1016/j.ifacol.2015.06.328⟩
Communication dans un congrès
emse-01194483v1
|
|
Optimizing Series-Parallel Execution of Intersecting Blocks of Operations15th IFAC Symposium on Information Control Problems in Manufacturing — INCOM 2015, May 2015, Ottawa, Canada. pp.Pages 1785-1789, ⟨10.1016/j.ifacol.2015.06.345⟩
Communication dans un congrès
emse-01194463v1
|
|
Inventory control and risk management in supply chains under lead time uncertainties2015 IEEE Symposium on Analytics and Risk in Complex Management Systems (ISARCRM 2015), University of Chinese Academy of Sciences, Aug 2015, Beijing, China
Communication dans un congrès
emse-01251058v1
|
|
Flow Line Balancing Problem: A SurveyIEEE International Conference on Industrial Engineering and Systems Management (IESM 2015), Oct 2015, Seville, Spain
Communication dans un congrès
hal-01313342v1
|
|
Minimizing number of stations and station activation costs for a production line with parallel tasksThe 27th European Conference on Operational Research, Jul 2015, Glasgow, United Kingdom
Communication dans un congrès
hal-01313348v1
|
|
Dynamic Innovation and Pricing Decisions in a Supply ChainThe 27th European Conference on Operational Research, Jul 2015, Glasgow, United Kingdom
Communication dans un congrès
hal-01313345v1
|
|
Supply Chain Design With Disruption Considerations: Review of Research Streams on the Ripple Effect in the Supply Chain15th IFAC Symposium on Information Control Problems in Manufacturing — INCOM 2015, May 2015, Ottawa, Canada. pp.Pages 1700-1707, ⟨10.1016/j.ifacol.2015.06.331⟩
Communication dans un congrès
emse-01194486v1
|
|
Combinatorial design of production lines Shaastrarth 2015: International Conference on Adavced Research Applications in Engineering and Technology, Rungta College of Engineering & Technology, Jun 2015, Bhilai, India. p. 3-15
Communication dans un congrès
emse-01251021v1
|
|
Distribution and operation planning at a cross-dock platform: A case of study at Renault4th International Conference on Advanced Logistics and Transport (ICALT), 2015, May 2015, Valenciennes, France. pp 193 - 198, ⟨10.1109/ICAdLT.2015.7136618⟩
Communication dans un congrès
emse-01171639v1
|
|
Editorial Policy of the International Journal of Production ResearchIIE International Conference on Engineering Systems and Networks: The way ahead for industrial engineering and operations management (ICIEOM-CIO-IIIE 2015), Universidade de Aveiro, Jul 2015, Aveiro, Portugal
Communication dans un congrès
emse-01251043v1
|
|
Combining Procurement and Disassembly Decisions for End-of-Life Product16ème congrès de la société française de recherche opérationnelle et aide à la décision (ROADEF), Feb 2015, Marseille, France
Communication dans un congrès
emse-01236705v1
|
|
Programmation des activités dans une plateforme cross-dock internationale : Cas d’étude chez Renault.16ème congrès de la société française de recherche opérationnelle et aide à la décision (ROADEF), Feb 2015, Marseille, France
Communication dans un congrès
emse-01250649v1
|
|
Supply planning for multi-levels assembly system under random lead times15th IFAC Symposium on Information Control Problems in Manufacturing — INCOM 2015, May 2015, Ottawa, Canada. pp.Pages 254-259, ⟨10.1016/j.ifacol.2015.06.090⟩
Communication dans un congrès
emse-01194471v1
|
|
A bibliographic review of production line design and balancing under uncertainty15th IFAC Symposium on Information Control Problems in Manufacturing — INCOM 2015, May 2015, Ottawa, Canada. pp.Pages 70-75, ⟨10.1016/j.ifacol.2015.06.060⟩
Communication dans un congrès
emse-01194461v1
|
|
Coordination of Collection and Disassembly Planning for End-of-Life Product15th IFAC Symposium on Information Control Problems in Manufacturing — INCOM 2015, May 2015, Ottawa, Canada. pp.Pages 76-80, ⟨10.1016/j.ifacol.2015.06.061⟩
Communication dans un congrès
emse-01236691v1
|
|
Dealing with the collection and the disassembly planning for simple end-of-life productJournées Nationales/ Doctorales MACS 2015, Jun 2015, Bourges, France. 5p
Communication dans un congrès
emse-01236674v1
|
|
An example of university-industry based R&D for machining industry in FranceThe 34th Conference for Operations Research and Industrial Engineering (YAEM 2014), Jun 2014, Bursa, Turkey
Communication dans un congrès
emse-01084199v1
|
|
COMBINATORIAL DESIGN OF COMPLEX MACHINING SYSTEMS FOR AUTOMOTIVE INDUSTRYCombinatorial design of complex machining systems for automotive industry : Séminaire du CIRRELT, Lab. CIRRELT, Université Laval, Jun 2014, Québec, France
Communication dans un congrès
emse-01084215v1
|
|
The International Journal of Production Research: current policy and perspectivesThe International Journal of Production Research: current policy and perspectives, Hefei University of Technology,, Jul 2014, Hefei, China
Communication dans un congrès
emse-01084218v1
|
|
Dealing with variations for a supplier selection problem in a flexible supply chain: a dynamic optimization approachICORES 2014, 2014, Angers, France
Communication dans un congrès
hal-02097945v1
|
|
|
Reducing the Research Space of Possible Order Release Dates for Multi-level Assembly Systems under Stochastic Lead TimesIFIP International Conference on Advances in Production Management Systems (APMS), Sep 2014, Ajaccio, France. pp.368-374, ⟨10.1007/978-3-662-44733-8_46⟩
Communication dans un congrès
emse-01061104v1
|
Combinatorial design of complex machines and machining lines6th International Conference “Tanaev’s Readings”, National Academy of Sciences of Belarus, Mar 2014, Minsk, Belarus. p. 171-178
Communication dans un congrès
emse-01083948v1
|
|
Disassembly Line Balancing and Sequencing under Uncertainty21st CIRP Conference on Life Cycle Engineering, Jun 2014, Trondheim, Norway. pp.Pages 239-244, ⟨10.1016/j.procir.2014.06.016⟩
Communication dans un congrès
emse-01011304v1
|
|
Genetic algorithm for multi-level assembly systems under stochastic lead timesThe 19th World Congress of The International Federation of Automatic Control, Aug 2014, Cape Town, South Africa. 6p
Communication dans un congrès
emse-01063244v1
|
|
A Survey on Cost and Profit Oriented Assembly Line BalancingThe 19th World Congress of The International Federation of Automatic Control, Aug 2014, Cape Town, South Africa. 9p
Communication dans un congrès
emse-01063028v1
|
|
Optimal design of assembly lines with flexible workers20th Conference of the International Federation of Operational Research Societies (IFORS), Jul 2014, Barcelone, Spain
Communication dans un congrès
emse-01084113v1
|
|
Dealing with Variations for a Supplier Selection Problem in a Flexible Supply Chain3rd International Conference on Operations Research and Enterprise Systems (ICORES 2014), Mar 2014, Angers, France. p. 322-327, ⟨10.5220/0004924603220327⟩
Communication dans un congrès
emse-01083898v1
|
|
Chance-constrained programming for one level assembly system under random lead timesThe 18th International Symposium on Inventories, Aug 2014, Budapest, Hungary
Communication dans un congrès
emse-01084143v1
|
|
Supply planning for assembly systems under stochastic lead timesThe 34th Conference for Operations Research and Industrial Engineering (YAEM 2014),, Uludag University, Jun 2014, Bursa, Turkey
Communication dans un congrès
emse-01084157v1
|
|
Supply Planning for Assembly Systems under Stochastic Lead Times, An example of university-industry based R&D for machining industry in FranceThe 34th Conference for Operations Research and Industrial Engineering (YAEM 2014), Jun 2014, Bursa, Turkey
Communication dans un congrès
emse-01084174v1
|
|
Lagrangian Relaxation for Stochastic Disassembly Line Balancing ProblemVariety Management in Manufacturing -- Proceedings of the 47th CIRP Conference on Manufacturing Systems, Apr 2014, Windsor, Canada. pp.Pages 56-60, ⟨10.1016/j.procir.2014.02.049⟩
Communication dans un congrès
emse-01052948v1
|
|
Relaxation lagrangienne pour le problème de conception de lignes de désassemblage sous incertitudesROADEF - 15ème congrès annuel de la Société française de recherche opérationnelle et d'aide à la décision, Société française de recherche opérationnelle et d'aide à la décision, Feb 2014, Bordeaux, France
Communication dans un congrès
hal-00946445v1
|
|
|
Cooperative control in production and logistics19th IFAC World Congress, August 24-29, 2014, IFAC'14, Aug 2014, Cape Town, South Africa. pp.4246-4265, ⟨10.3182/20140824-6-ZA-1003.01026⟩
Communication dans un congrès
emse-01063021v1
|
Une sélection de fournisseurs pour l'adaptation de la chaîne logistique: une approche d'optimisation dynamiqueROADEF - 15ème congrès annuel de la Société française de recherche opérationnelle et d'aide à la décision, Société française de recherche opérationnelle et d'aide à la décision, Feb 2014, Bordeaux, France
Communication dans un congrès
hal-00946374v1
|
|
Workforce Minimization for a Mixed-Model Assembly LineEighteenth International Working Seminar on Production Economics, Feb 2014, Innsbruck, Austria. p. 51-63
Communication dans un congrès
emse-01083908v1
|
|
Integrated Procurement-Disassembly ProblemIFIP WG 5.7 International Conference, APMS 2014, Sep 2014, Ajaccio, France. pp.482-490
Communication dans un congrès
emse-01065860v1
|
|
Global Perspectives on Industrial Engineering8th International Conference on Industrial Engineering and Industrial Management XX International Conference on Industrial Engineering and Operations Management International IIE C onference 2014, Jul 2014, Malaga, Spain
Communication dans un congrès
emse-01084208v1
|
|
Modélisation et optimisation des systèmes industrielsColloque IMT « Grande échelle et complexité », Institut Mines-Télécom, Mar 2014, Paris, France
Communication dans un congrès
emse-01084347v1
|
|
Affectation optimale des opérateurs aux postes de travail dans une ligne de montage dans l'industrie automobile19èmes journées STP du GdR MACS, Arts et Métiers ParisTech, Apr 2014, Paris, France
Communication dans un congrès
emse-01084353v1
|
|
Approvisionnement d'une chaîne logistique agile: une approche d'optimisation dynamiqueConférence Internationale sur la Modélisation, l’Optimisation et la Simulation : de l’Economie Linéaire à l’Economie Circulaire (MOSIM 2014), Nov 2014, Nancy, France. 10p
Communication dans un congrès
emse-01083860v1
|
|
A multi-objective algorithm for balancing reconfigurable transfer lines20th Conference of the International Federation of Operational Research Societies (IFORS), Jul 2014, Barcelone, Spain
Communication dans un congrès
emse-01084120v1
|
|
Lot-sizing and lot sequencing on a single imperfect machine with breakdowns and product rejects20th Conference of the International Federation of Operational Research Societies (IFORS), Jul 2014, Barcelone, Spain
Communication dans un congrès
emse-01084134v1
|
|
|
Integrated Procurement–Disassembly ProblemIFIP International Conference on Advances in Production Management Systems (APMS), Sep 2014, Ajaccio, France. pp.482-490, ⟨10.1007/978-3-662-44736-9_59⟩
Communication dans un congrès
hal-01387922v1
|
Disassembly Line Balancing Problem with Fixed Number of Workstations under Uncertainty19th IFAC World Congress, Aug 2014, Cape Town, South Africa. p. 3522 - 3526, ⟨10.3182/20140824-6-ZA-1003.02788⟩
Communication dans un congrès
emse-01083709v1
|
|
A sample average approximation method for disassembly line design under uncertaintyEuropean Conference on Stochastic Programming and Energy Applications, 1st EURO Mini-Conference, Sep 2014, Paris, France
Communication dans un congrès
emse-01083968v1
|
|
Heuristics for process plan design for machining of groups of parts at reconfigurable unit-head machinesNational Academy of Sciences of Belarus, Proceedings of the 6th International Conference “Tanaev’s Readings”, Mar 2014, Minsk, France. p. 9-13
Communication dans un congrès
emse-01083887v1
|
|
Genetic Algorithm for Multi-Level Assembly Systems under Stochastic Lead Times19th IFAC World Congress, Aug 2014, Cape Town, South Africa. p. 778-783, ⟨10.3182/20140824-6-ZA-1003.01522⟩
Communication dans un congrès
emse-01083831v1
|
|
An efficient exact method for multilevel serial systems under uncertaities of lead times and fixed demandJoint Symposium “Computers and Industrial Engineering” and “Intelligent Manufacturing and Service Systems” (CIE44 & IMSS’14), Oct 2014, Istanbul, Turkey. p. 2182-2194
Communication dans un congrès
emse-01083869v1
|
|
Parallel Machining of Multiple Parts on Rotary Transfer Machines with Turrets7th IFAC Conference on Manufacturing Modelling, Management, and Control, 2013, Jun 2013, St Petersburg, Russia. pp. 1477-1482, ⟨10.3182/20130619-3-RU-3018.00373⟩
Communication dans un congrès
emse-00881635v1
|
|
|
Chance Constrained Programming Model for Stochastic Profit-Oriented Disassembly Line Balancing in the Presence of Hazardous Parts20th Advances in Production Management Systems (APMS), Sep 2013, State College, PA, United States. pp.103-110, ⟨10.1007/978-3-642-41266-0_13⟩
Communication dans un congrès
emse-00880909v1
|
Utilisation des modèles stochastiques et des techniques d'optimisation combinatoire pour le paramétrage de MRP (Manufacturing Resource Planning)Colloque sur l'Optimisation et les Systèmes d'Information (COSI'2013), Jun 2013, Alger, Algérie
Communication dans un congrès
emse-00903940v1
|
|
Assembly Line Balancing: Conventional Methods and Extensions7th IFAC Conference on Manufacturing Modelling, Management, and Control, 2013, Jun 2013, St Petersburg, Russia. pp.43-48, ⟨10.3182/20130619-3-RU-3018.00644⟩
Communication dans un congrès
emse-00881523v1
|
|
|
Optimization of Multi-Tool Cutting Modes in Multi-Item Batch Manufacturing System7th IFAC Conference on Manufacturing Modelling, Management, and Control, 2013, Jun 2013, St Petersburg, Russia. pp. 766-771, ⟨10.3182/20130619-3-RU-3018.00357⟩
Communication dans un congrès
emse-00881533v1
|
|
A Graphical Algorithm for Solving an Investment Optimization ProblemMultidisciplinary International Conference on Scheduling: Theory and Applications (MISTA 2013), Aug 2013, Ghent, Belgium. 27p
Communication dans un congrès
emse-00851924v1
|
Assembly Line Balancing: Applications in Machining EnvironmentsAssembly Line Balancing: Applications in Machining Environments, Nov 2013, Hefei, China
Communication dans un congrès
emse-00927708v1
|
|
Minimizing station activation costs in a line design problemEURO-INFORMS 26th European Conference on Operational Research, Jul 2013, Rome, Italy. p 140
Communication dans un congrès
emse-00903996v1
|
|
|
L-Shaped Algorithm for Stochastic Disassembly Line Balancing Problem7th IFAC Conference on Manufacturing Modelling, Management, and Control, 2013, Jun 2013, St Petersburg, Russia. pp. 407-411, ⟨10.3182/20130619-3-RU-3018.00500⟩
Communication dans un congrès
emse-00881583v1
|
Optimization of execution rate for intersected sets of serie-parralel tasksInternational Congress on Computer Science: Information Systems and Technologies (CSIST'2013), Nov 2013, Minsk, Belarus. 5 p
Communication dans un congrès
emse-00903598v1
|
|
|
Reconfiguration des lignes d'usinage de transfertQuatorzième congrès annuel de la Société Française de recherche Opérationnelle et d'Aide à la Décision (ROADEF 2013), Feb 2013, Troyes, France. Session S74 : Conception optimisée de lignes de production
Communication dans un congrès
emse-00904022v1
|
An exact approach to improve the reusability of serial machining linesInternational Conference on Industrial Engineering and Systems Management (IESM'2013), Oct 2013, Rabat, Morocco. 10 p
Communication dans un congrès
emse-00903611v1
|
|
|
An Exact Method for the Assembly Line Re-balancing Problem20th Advances in Production Management Systems (APMS), Sep 2013, State College, PA, United States. pp.159-166, ⟨10.1007/978-3-642-41266-0_20⟩
Communication dans un congrès
emse-00880913v1
|
Minimizing station activation costs in a multi-model transfer line with parallel operations at workstations26th Conference of the European Chapter on Combinatorial Optimization (ECCO XXVI), May 2013, Paris, France. p. 108
Communication dans un congrès
emse-00904013v1
|
|
Experimental study of a decomposition approach for a sequencing and lot-sizing under uncertaintiesInternational Conference on Industrial Engineering and Systems Management (IESM'2013), Oct 2013, Rabat, Morocco. 10 p
Communication dans un congrès
emse-00903609v1
|
|
Optimization techniques for MRP parametrization under lead time uncertaintiesThe First International Conference on Reasoning and Optimization in Information Systems (ROIS'2013), Sep 2013, Hammam- Sousse, Tunisia
Communication dans un congrès
emse-00903624v1
|
|
The International Journal of Production Research22nd International Conference on Production Research (ICPR-22), Jul 2013, Iguassu falls, Brazil
Communication dans un congrès
emse-00927729v1
|
|
Optimization for supply planning in multi-level assembly systems with stochastic lead-timesInternational Conference on Industrial Engineering and Systems Management (IESM'2013), Oct 2013, Rabat, Morocco. 10 p
Communication dans un congrès
emse-00903613v1
|
|
A Graphical Approach for Solving Single Machine Scheduling Problems Approximately7th IFAC Conference on Manufacturing Modelling, Management, and Control, 2013, Jun 2013, St Petersburg, Russia. pp. 1340-1345, ⟨10.3182/20130619-3-RU-3018.00010⟩
Communication dans un congrès
emse-00881617v1
|
|
A Transfer Line Design Problem with Setup Times and Costs7th IFAC Conference on Manufacturing Modelling, Management, and Control, 2013, Jun 2013, St Petersburg, Russia. pp. 778-783, ⟨10.3182/20130619-3-RU-3018.00029⟩
Communication dans un congrès
emse-00881592v1
|
|
A parallel algorithm for optimization of execution times of intersected sets of serie-parralel tasksInternational Congress on Computer Science: Information Systems and Technologies (CSIST'2013), Nov 2013, Minsk, Belarus. 5 p
Communication dans un congrès
emse-00903592v1
|
|
Replenishements Planning under Lead Time Uncertainties4th International Conference on Complex Science Management, Nov 2013, Wuhan, China
Communication dans un congrès
emse-00926783v1
|
|
Mathematical Model for Supply Planning of Multi-level Assembly Systems with Stochastic Lead Times7th IFAC Conference on Manufacturing Modelling, Management, and Control, 2013, Jun 2013, St Petersburg, Russia. pp. 389-394, ⟨10.3182/20130619-3-RU-3018.00335⟩
Communication dans un congrès
emse-00881656v1
|
|
|
Maximisation du rayon de stabilité pour l'affectation d'opérations de durée incertaine sur une ligne d'assemblage14e Congrès Annuel de la Société Française de Recherche Opérationnelle et d'Aide à la Décision (ROADEF 2013), Feb 2013, Troyes, France
Communication dans un congrès
hal-01721568v1
|
|
Integration of additional purchase cost to reduce the lead time uncertainty for one level assembly system7th IFAC Conference on Manufacturing Modelling, Management, and Control, 2013, Jun 2013, St Petersburg, Russia. pp. 383-388, ⟨10.3182/20130619-3-RU-3018.00561⟩
Communication dans un congrès
emse-00881563v1
|
|
Équilibrage des lignes de désassemblage sous incertitude en présence de composants polluantsQuatorzième congrès annuel de la Société Française de recherche Opérationnelle et d'Aide à la Décision (ROADEF 2013), Feb 2013, Troyes, France. Session S74 : Conception optimisée de lignes de production
Communication dans un congrès
emse-00796776v1
|
Solving an Investment Optimization Problem by an Improved Graphical Approach22nd International Conference on Production Research (ICPR-22), Jul 2013, Iguassu Falls, Brazil. pp.ID : 121
Communication dans un congrès
emse-00903578v1
|
|
A Graphical Algorithm for Solving an Investment Optimization Problem6th Multidisiplinary International Scheduling Conference: Theory and Applications (MISTA 2013), Aug 2013, Ghent, Belgium. p. 290-299
Communication dans un congrès
emse-00881684v1
|
|
Speech when Appointed as a Fellow of the European Academy for Industrial ManagementAdvances in Sustainable Production Conference (AIM 2013), Sep 2013, Split, Croatia
Communication dans un congrès
emse-00927745v1
|
|
Stable Optimal Line Balances with a Fixed Set of the Working Stations7th IFAC Conference on Manufacturing Modelling, Management, and Control, 2013, Jun 2013, St Petersburg, Russia. pp. 1726-1731, ⟨10.3182/20130619-3-RU-3018.00564⟩
Communication dans un congrès
emse-00881644v1
|
|
A Cone programming approach for stochastic disassembly line balancing in the presence of hazardous parts22nd International Conference on Production Research (ICPR-22), Jul 2013, Iguassu Falls, Brazil. pp.ID : 284
Communication dans un congrès
emse-00903570v1
|
|
Application of Control Theoretic Tools to Supply Chain Disruptions Management7th IFAC Conference on Manufacturing Modelling, Management, and Control, 2013, Jun 2013, St Petersburg, Russia. pp. 1926-1931, ⟨10.3182/20130619-3-RU-3018.00294⟩
Communication dans un congrès
emse-00881649v1
|
|
On Complexity of Buffers Allocation Problems for Production Lines with Unreliable MachinesThe IV International Conference on Optimization Methods and Appliations (OPTIMA-2013), Sep 2013, Petrovac, Montenegro. p 175
Communication dans un congrès
emse-00903974v1
|
|
|
Planification des réapprovisionnements pour système d'assemblage à deux niveaux quand les délais d'approvisionnement sont aléatoiresQuatorzième congrès annuel de la Société Française de recherche Opérationnelle et d'Aide à la Décision (ROADEF 2013), Feb 2013, Troyes, France. pp.Session 26 : Lot sizing
Communication dans un congrès
emse-00796784v1
|
Enumeration of the stable optimal line balances for a simple assembly line balancing problem with fixed cycle time22nd International Conference on Production Research (ICPR-22), Jul 2013, Iguassu Falls, Brazil. pp.ID : 123
Communication dans un congrès
emse-00903573v1
|
|
|
Supply Planning and Inventory Control under Lead Time Uncertainty: A Review7th IFAC Conference on Manufacturing Modelling, Management, and Control, 2013, Jun 2013, St Petersburg, Russia. pp. 359-370, ⟨10.3182/20130619-3-RU-3018.00592⟩
Communication dans un congrès
emse-00881549v1
|
A new formulation for the assembly line re-balancing problem26th Conference of the European Chapter on Combinatorial Optimization (ECCO XXVI), May 2013, Paris, France. p. 128
Communication dans un congrès
emse-00880950v1
|
|
Solution algorithms for the two-station single track railway scheduling problem6th Multidisiplinary International Scheduling Conference: Theory and Applications (MISTA 2013), Aug 2013, Ghent, Belgium. p. 636-640
Communication dans un congrès
emse-00881687v1
|
|
A Decomposition Method for Stochastic Partial Disassembly Line Balancing with Profit Maximization9th IEEE Conference on Automation Science and Engineering (CASE'2013), Aug 2013, Madison, United States
Communication dans un congrès
emse-00903586v1
|
|
Two Dedicated Parallel Machines Scheduling Problem with Precedence RelationsInternational Annual Conference of the German Operations Research Society (OR'2012), Sep 2012, Hannovre, Germany. pp 403-408, ⟨10.1007/978-3-319-00795-3_60⟩
Communication dans un congrès
emse-00766896v1
|
|
Notes on Complexity of the Simple Assembly Line Balancing ProblemConference UKI'2012, Apr 2012, Moscou, Russia. 8 p
Communication dans un congrès
emse-00766921v1
|
|
Intelligent Identification Algorithms for Frequency/Power Control in Smart Grid14th IFAC Symposium on Information Control Problems in Manufacturing (INCOM12), May 2012, Bucharest, Romania. pp 940-945, ⟨10.3182/20120523-3-RO-2023.00304⟩
Communication dans un congrès
emse-00693930v1
|
|
An Intelligent PLM System for Machining Environment14th IFAC Symposium on Information Control Problems in Manufacturing (INCOM12), May 2012, Bucharest, Romania. pp 1065-1070, ⟨10.3182/20120523-3-RO-2023.00408⟩
Communication dans un congrès
hal-00681256v1
|
|
On complexity of optimal recombination in genetic algorithms for one-dinansional bin paking problemsIII-th International conference on Dynamics of Systems, Mechanismes and Machines, Nov 2012, Omsk, Russia. p. 25-27
Communication dans un congrès
emse-00881669v1
|
|
Decomposition methods for synthesis of manufacturing processes for machining at flow lines composed of rotary transfer machines4th International Conference on Supercomputers and their Applications (SSA'12), Oct 2012, Minsk, Belarus. p. 172-176
Communication dans un congrès
emse-00881674v1
|
|
|
Minimisation du coût de setup pour des lignes d'usinage multi-produits9th International Conference on Modeling, Optimization & SIMulation - MOSIM'12, Jun 2012, Bordeaux, France. 10p
Communication dans un congrès
hal-00728592v1
|
An Application of Goal Programming Technique for Reconfiguration of Transfer Lines9th International Conference on Informatics in Control, Automation and Robotics (ICINCO'2012), Jul 2012, Rome, Italy. pp 539-542
Communication dans un congrès
emse-00766907v1
|
|
Minimisation du coût de sélection d'outils par les approches Min-Max et Min-Max Regret13ème Congrès Annuel de la Société Française de Recherche Opérationnelle et d'Aide à la Décision (ROADEF), Apr 2012, Angers, France. 2p
Communication dans un congrès
emse-00694335v1
|
|
|
Optimal Design of Rotary Transfer Machines with Turrets14th IFAC Symposium on Information Control Problems in Manufacturing (INCOM12), May 2012, Bucharest, Romania. pp.407-412, ⟨10.3182/20120523-3-RO-2023.00416⟩
Communication dans un congrès
hal-00681257v1
|
Combinatorial optimization techniques for the design of reconfigurable machines25-th Conference on Operational Research (EURO'2012), Jul 2012, Vilnius, Lithuania. p 157
Communication dans un congrès
emse-00904080v1
|
|
Attainable Sets and Their Possible Applications to Supply Chain Analysis14th IFAC Symposium on Information Control Problems in Manufacturing (INCOM12), May 2012, Bucharest, Romania. pp 578-583, ⟨10.3182/20120523-3-RO-2023.00088⟩
Communication dans un congrès
emse-00693959v1
|
|
Radio Frequency IDentification (RFID) in Supply Chain: Technology, Applications and Concerns14th IFAC Symposium on Information Control Problems in Manufacturing, May 2012, Bucharest, Romania. pp 49-56, ⟨10.3182/20120523-3-RO-2023.00448⟩
Communication dans un congrès
emse-00734894v1
|
|
Solution algorithms for the two-station single track railway scheduling problem7th International conference on IT in Industry (ITI 2012), Oct 2012, Minsk, Belarus. p. 111-112
Communication dans un congrès
emse-00904037v1
|
|
An exact algorithm for balancing of a production line with parallel machinesVIII-th International conference on Dynamics of Systems, Mechanisms and Machines, Nov 2012, Omsk, Russia. p. 13-16
Communication dans un congrès
emse-00694338v1
|
|
Robust U-Type Assembly Line Balancing Problem: A Decomposition Based Approximate Solution Algorithm17th International Working Seminar on Production Economics, Feb 2012, Innsbruck, Austria. Paper220, p. 225-230
Communication dans un congrès
emse-00679488v1
|
|
A stochastic formulation of the disassembly line balancing problem25-th Conference on Operational Research (EURO'2012), Jul 2012, Vilnius, Lithuania. p 127
Communication dans un congrès
emse-00904077v1
|
|
Optimization of Multi-tool Cutting Modes for Batch Manufacturing in Large Series Machining Environment14th IFAC Symposium on Information Control Problems in Manufacturing (INCOM12), May 2012, Bucharest, Romania. pp 444-448, ⟨10.3182/20120523-3-RO-2023.00417⟩
Communication dans un congrès
emse-00693933v1
|
|
MRP parameterization for multi-level assembly system under random lead times7th International conference on IT in Industry (ITI 2012), Oct 2012, Minsk, Belarus. p. 23-24
Communication dans un congrès
emse-00771455v1
|
|
Some Complexity Results for the Simple Assembly Line Balancing ProblemIII International conference Optimization and applications, Sep 2012, Costa da Caparica, Portugal. pp 81-85
Communication dans un congrès
emse-00733610v1
|
|
|
A Stochastic Formulation of the Disassembly Line Balancing Problem19th Advances in Production Management Systems (APMS), Sep 2012, Rhodes, Greece. pp.397-404, ⟨10.1007/978-3-642-40352-1_50⟩
Communication dans un congrès
emse-00766872v1
|
A stochastic formulation of the disassembly line balancing problem7th International conference on IT in Industry (ITI 2012), Oct 2012, Minsk, Belarus. p. 29-30
Communication dans un congrès
emse-00904027v1
|
|
A mathematical model for a reconfiguration problem of transfer machining lines14th IFAC Symposium on Information Control Problems in Manufacturing (INCOM'12), May 2012, Bucharest, Romania. pp 438-443, ⟨10.3182/20120523-3-RO-2023.00419⟩
Communication dans un congrès
hal-00681254v1
|
|
Two station single track railway scheduling problem with equal speed of trains21st International Symposium on Mathematical Programming (ISMP 2012), Aug 2012, Berlin, Germany. p 116
Communication dans un congrès
emse-00904061v1
|
|
Decision-aid support in design of machining systemsThe International Conference on Industrial Engineering & Manufacturing (ICIEM'2012), May 2012, Batna, Algeria. ⟨10.4018/978-1-59904-843-7.ch018⟩
Communication dans un congrès
emse-00694321v1
|
|
Optimization in Design of Automated Machining Systems9th International Conference on Informatics in Control, Automation and Robotics (ICINCO'2012), Jul 2012, Rome, Italy
Communication dans un congrès
emse-00766913v1
|
|
Production Lot Sizes on a Single Imperfect Machine: FPTAS vs ILP Models14th IFAC Symposium on Information Control Problems in Manufacturing (INCOM12), May 2012, Bucharest, Romania. pp 590-595, ⟨10.3182/20120523-3-RO-2023.00421⟩
Communication dans un congrès
emse-00693939v1
|
|
Balancing Reconfigurable Machining Lines by Means of Set Partitioning Model14th IFAC Symposium on Information Control Problems in Manufacturing (INCOM12), May 2012, Bucharest, Romania. pp 426-431, ⟨10.3182/20120523-3-RO-2023.00354⟩
Communication dans un congrès
emse-00693963v1
|
|
Étude expérimentale de la sensibilité de configurations d'un système d'assemblage en présence de données incertaines13e Congrès Annuel de la Société Française de Recherche Opérationnelle et d'Aide à la Décision (ROADEF 2012), Apr 2012, Angers, France
Communication dans un congrès
hal-01721756v1
|
|
|
CONFIGURATION D'UN SYSTÈME D'ASSEMBLAGE MULTI-NIVEAUX SOUS INCERTITUDES DES DÉLAIS D'APPROVISIONNEMENT9th International Conference on Modeling, Optimization & SIMulation, Jun 2012, Bordeaux, France. 10p
Communication dans un congrès
hal-00728594v1
|
Mathematical models for selection of process plans at preliminary design of modular transfer lines using group technology for machining of different products7th International conference on IT in Industry (ITI 2012), Oct 2012, Minsk, Belarus. 2 p
Communication dans un congrès
emse-00904039v1
|
|
Batch scheduling and transfer line design problems25-th Conference on Operational Research (EURO'2012), Jul 2012, Vilnius, Lithuania. p 85
Communication dans un congrès
emse-00904073v1
|
|
On Applicability of Optimal Control Theory to Adaptive Supply Chain Planning and SchedulingThe 18th IFAC World Congress, Aug 2011, Milano, Italy. p. 423-434, ⟨10.3182/20110828-6-IT-1002.01243⟩
Communication dans un congrès
emse-00674869v1
|
|
Optimisation des transmissions hydromécaniques de boites de vitesses12ème congrès de la société Française de Recherche Opérationnelle et d'Aide à la Décision (ROADEF 2011), Mar 2011, Saint Etienne, France. pp.submission 475
Communication dans un congrès
emse-00679615v1
|
|
Équilibrage robuste flexible de SALBP-1 avec les données incertaines12e Congrès Annuel de la Société Française de Recherche Opérationnelle et d'Aide à la Décision (ROADEF 2011), Mar 2011, Saint-Étienne, France
Communication dans un congrès
hal-01721751v1
|
|
An Exact Solution Algorithm For Balancing Simple U-Type AssemblyInternational Conference on Production Research (ICPR 21) : Innovation in Product and Production, Jul 2011, Stuttgart, Germany. 4p
Communication dans un congrès
emse-00674872v1
|
|
Paramétrage de logiciels MRP dans un environnement incertain12ème congrès de la société Française de Recherche Opérationnelle et d'Aide à la Décision (ROADEF 2011), Mar 2011, Saint Etienne, France. pp.submission 470
Communication dans un congrès
emse-00679636v1
|
|
B&B algorithm for supply planning of multilevel serial systems with stochastic lead times12ème congrès de la société Française de Recherche Opérationnelle et d'Aide à la Décision (ROADEF 2011), Mar 2011, Saint Etienne, France. pp.submission 432
Communication dans un congrès
emse-00679628v1
|
|
A Minimum Cost Transfer Line Design Problem : A Set Partitioning Model And Computer Experiments12ème congrès de la société Française de Recherche Opérationnelle et d'Aide à la Décision (ROADEF 2011), Mar 2011, Saint Etienne, France. pp.submission 399
Communication dans un congrès
emse-00679624v1
|
|
A New Model for Equipment Selection and Transfer Line Design ProblemThe 18th IFAC World Congress, Aug 2011, Milano, Italy. p. 3962-3967, ⟨10.3182/20110828-6-IT-1002.01182⟩
Communication dans un congrès
emse-00674866v1
|
|
Robust Optimization Approaches To Minimum Cost Tools Selection Problems12ème congrès de la société Française de Recherche Opérationnelle et d'Aide à la Décision (ROADEF 2011), Mar 2011, Saint Etienne, France. pp.submission 436
Communication dans un congrès
emse-00679631v1
|
|
Planification multi-périodes des réapprovisionnements d'un système d'assemblage à plusieurs niveaux face aux aléas des délais d'approvisionnements12ème congrès de la société Française de Recherche Opérationnelle et d'Aide à la Décision (ROADEF 2011), Mar 2011, Saint Etienne, France. pp.submission 452
Communication dans un congrès
emse-00679633v1
|
|
A Survey on RFID Technology ant its Impact on Enterprises12ème congrès de la société Française de Recherche Opérationnelle et d'Aide à la Décision (ROADEF 2011), Mar 2011, Saint Etienne, France. pp.submission 472
Communication dans un congrès
emse-00679639v1
|
|
Conception d'une ligne d'usinage reconfigurable à l'aide d'un algorithme génétique multiobjectif12ème congrès de la société Française de Recherche Opérationnelle et d'Aide à la Décision (ROADEF 2011), Mar 2011, Saint Etienne, France
Communication dans un congrès
emse-00710365v1
|
|
Minimizing setup cost for multipart production lines41st International Conference on Computers & Industrial Engineering, Oct 2011, Los Angeles, United States. pp. 566-571
Communication dans un congrès
emse-00710370v1
|
|
Genetic algorithm for a balancing machining lines problem41st International Conference on Computers & Industrial Engineering, Oct 2011, Los Angeles, United States. pp. 116-121
Communication dans un congrès
emse-00710372v1
|
|
The One-Period Inventory Control For One-Level Assembly Systems Under UncertaintyInternational Conference on Production Research (ICPR 21) : Innovation in Product and Production, Jul 2011, Stuttgart, Germany. 6p
Communication dans un congrès
emse-00674873v1
|
|
Simple assembly line balancing under uncertainty: a robust approachInternational Conference on Production Research (ICPR 21) : Innovation in Product and Production, Jul 2011, Metz, France. p. 87 -- 92
Communication dans un congrès
emse-00674875v1
|
|
Choix de gammes pour la conception de machines spéciales travaillant par batch multi-produit ou reconfigurables12ème congrès de la société Française de Recherche Opérationnelle et d'Aide à la Décision (ROADEF 2011), Mar 2011, Saint Etienne, France. pp.submission 473
Communication dans un congrès
emse-00679640v1
|
|
Conception d'une ligne d'usinage reconfigurable : étude de cas9e Congrès International de Génie Industriel, Nov 2011, Saint-Sauveur, Canada
Communication dans un congrès
emse-00710368v1
|
|
Optimisation de processus d'usinage pour des machines spéciales à boîtiers multibroches12ème congrès de la société Française de Recherche Opérationnelle et d'Aide à la Décision (ROADEF 2011), Mar 2011, Saint Etienne, France. pp.submission 474
Communication dans un congrès
emse-00679643v1
|
|
|
U-Shaped Assembly Line Balancing under Uncertainty: A Robust Optimization Model12e congrès de la société Française de Recherche Opérationnelle et d'Aide à la Décision (ROADEF 2011), Mar 2011, Saint Etienne, France
Communication dans un congrès
emse-00679618v1
|
Solution methods for a multi-product lot-sizing and sequencing problem in a flow-shop12th IFAC Symposium on Large Scale Systems: Theory and Applications (2010), Jul 2010, Villeneuve d'Ascq, France. ⟨10.3182/20100712-3-FR-2020.00041⟩
Communication dans un congrès
emse-00675634v1
|
|
Reducing transfer balancing problem with known blocks and parallel activation mode to a set partitioning problemTanaev's Readings the 4th International Conference, Mar 2010, Minsk, Russia. p. 159-163, ISBN 978-985-6744-61-0
Communication dans un congrès
emse-00675665v1
|
|
New Trends and Challenges in Transfer Line BalancingAPMS 2010 International Conference - Advances in Production Management Systems, Oct 2010, Italy. pp.286
Communication dans un congrès
emse-00674879v1
|
|
Balancing and Equipment Selection of Modular Machining LinesThe 60th IIE Annual Conference, Jun 2010, Cancun, Mexico
Communication dans un congrès
emse-00710378v1
|
|
A problem of buffer allocation in production lines: complexity analysis and genetic algorithmsInternational Conference on Metaheuristics and Nature Inspired Computing (META'2010), Oct 2010, Djerba, Tunisia. pp.submission 158
Communication dans un congrès
emse-00679697v1
|
|
A Lot-sizing and Sequencing Problem Under Uncertainties: Comparison of Solution Approach16th International Working Seminar on Production Economics (IWSPE'2010), Mar 2010, Innsbruck, Austria. p. 469-480
Communication dans un congrès
emse-00675677v1
|
|
Analyse de sensibilité pour le problème d'équilibrage des lignes d'assemblage de type SALBP-211e Congrès Annuel de la Société Française de Recherche Opérationnelle et d'Aide à la Décision (ROADEF 2010), Feb 2010, Toulouse, France
Communication dans un congrès
hal-01714810v1
|
|
Assembly line balancing problems under uncertainties25th Mini-EURO Conference on Uncertainty and Robustness in Planning and Decision Making (URPDM 2010), Apr 2010, Coimbra, Portugal
Communication dans un congrès
hal-01714811v1
|
|
On the independent set problem in triangle graphs12th International Conference devoted to Project Management and Scheduling (PMS'2010), Apr 2010, Tours, France. p. 119-122
Communication dans un congrès
emse-00675651v1
|
|
Une métaheuristique basée sur le Path-Relinking pour l'optimisation d'un problème d'équilibrage de lignes de transfert11ème congrès de la société Française de Recherche Opérationnelle et d'Aide à la Décision (ROADEF 2010), Feb 2010, Toulouse, France
Communication dans un congrès
emse-00710382v1
|
|
Post-optimal analysis for a design problem of machining lines5th IFAC International Conference on Management and Control of Production and Logistics (MCPL 2010), Sep 2010, Coimbra, Portugal. ⟨10.3182/20100908-3-PT-3007.00051⟩
Communication dans un congrès
hal-01714817v1
|
|
Analyse de sensibilité du problème de l'équilibrage des lignes d'usinage: perturbation des temps opératoires8ème ENIM IFAC Conférence Internationale de Modélisation et Simulation (MOSIM'10), May 2010, Hammamet, Tunisie
Communication dans un congrès
hal-01714816v1
|
|
Combinatorial design of a minimum cost machining lineWorkshop New Challenges in Scheduling Theory, Sep 2010, Frejus, France
Communication dans un congrès
emse-00679704v1
|
|
A lot-sizing and scheduling problem under uncertaintiesWorkshop New Challenges in Scheduling Theory, Jul 2010, Lisbon, France. p 285
Communication dans un congrès
emse-00679726v1
|
|
Une approche génétique pour un problème de lotissement et de séquencement sous aléas8e Conférence Internationale Modélisation et Simulation (MOSIM'10), May 2010, Hammamet, Tunisie
Communication dans un congrès
emse-00675639v1
|
|
Reducing transfer balancing problem with known blocks and parallel activation mode to a set partitioning problemTanaev's Readings the 4th International Conference, Mar 2010, Minsk, Russia. p. 159-163, ISBN 978-985-6744-61-0
Communication dans un congrès
emse-00675669v1
|
|
Conception combinatoire de lignes de transfert avec unités d'usinage multi-broches11ème congrès de la société Française de Recherche Opérationnelle et d'Aide à la Décision (ROADEF 2010), Feb 2010, Toulouse, France
Communication dans un congrès
emse-00710384v1
|
|
A. Dolgui, An Inventory Model for Planned Lead Times Calculations under Lead Time Uncertainties and Service Level Constraint16th International Working Seminar on Production Economics (IWSPE'2010), Mar 2010, Innsbruck, Austria. p. 119-126
Communication dans un congrès
emse-00675685v1
|
|
Le paramétrage du MRP sous incertitudes de délais d'approvisionnements et demande : le cas de système d'assemblage à un niveau8e Conférence Internationale Modélisation et Simulation (MOSIM'10), May 2010, Hammamet, Tunisie. 8p
Communication dans un congrès
emse-00675645v1
|
|
Metaheuristics for buffer allocation in tandem production linesThe 60th IIE Annual Conference, Jun 2010, Cancun, Mexico
Communication dans un congrès
emse-00679739v1
|
|
Un problème de lotissement et de séquencement pour une ligne de production soumise aux aléas8ème congrès de la Société Française de Recherche Opérationnelle et d'Aide à la Décision, Feb 2010, Toulouse, France. p267
Communication dans un congrès
emse-00679746v1
|
|
Balancing machining transfer lines using genetic algorithms39th International Conference on Computers & Industrial Engineering (CIE39), Jul 2009, Troyes, France. ⟨10.1109/ICCIE.2009.5223752⟩
Communication dans un congrès
hal-01713859v1
|
|
Stochastic Dynamic Pricing Models of Monopoly Systems13th IFAC Symposium on Information Control Problems in Manufacturing (INCOM09), 2009, Moscou, Russia. p. 1452-1463, ⟨10.3182/20090603-3-RU-2001.00243⟩
Communication dans un congrès
emse-00676040v1
|
|
Balancing lines with CNC machines : Experimental study of a new heuristic20th International Conference on Production Research (ICPR-20), Aug 2009, Shanghai, China
Communication dans un congrès
emse-00710490v1
|
|
Generalized Newsboy Model for MRP Parameterization under Uncertainties13th IFAC Symposium on Information Control Problems in Manufacturing (INCOM09), 2009, Moscou, Russia. pp. 838-843, ⟨10.3182/20090603-3-RU-2001.00137⟩
Communication dans un congrès
emse-00679067v1
|
|
An Approach to Transfer Line Balancing Via a Special Set Partitioning Problem13th IFAC Symposium on Information Control Problems in Manufacturing (INCOM09), 2009, Moscou, Russia. p. 754-759, ⟨10.3182/20090603-3-RU-2001.00123⟩
Communication dans un congrès
emse-00679070v1
|
|
Multi-Product Lot-Sizing and Scheduling on Unrelated Parallel Machines to Minimize Makespan13th IFAC Symposium on Information Control Problems in Manufacturing (INCOM09), 2009, Moscou, Russia. p. 832-837, ⟨10.3182/20090603-3-RU-2001.00136⟩
Communication dans un congrès
emse-00679075v1
|
|
Balancing lines with CNC machines : a multi-start heuristic42th CIRP Conference on Manufacturing Systems, Jun 2009, Grenoble, France
Communication dans un congrès
emse-00710493v1
|
|
Due Date Assignment and Scheduling under Special Conditions on Job Processing13th IFAC Symposium on Information Control Problems in Manufacturing (INCOM09), 2009, Moscou, Russia. p. 520-525, ⟨10.3182/20090603-3-RU-2001.00086⟩
Communication dans un congrès
emse-00679072v1
|
|
Optimal Parameters for MRP with POQ PolicyConference on Industrial Engineering and Systems Management (IESM'2009), May 2009, Montréal, Canada. 9 p
Communication dans un congrès
emse-00679256v1
|
|
Métaheuristiques pour la conception en avant-projet des lignes d'usinage8ème Congrès International de Génie Industriel (CIGI'09), Jun 2009, Bagnères-de-Bigorre France
Communication dans un congrès
hal-01713857v1
|
|
A new problem of lot-sizing and sequencing under uncertainties23rd European Conference on Operational Research, Jul 2009, Bonn, Germany
Communication dans un congrès
emse-00679778v1
|
|
Un algorithme bi-objectif pour les systèmes d'assemblage bi-niveaux avec incertitude de délais d'approvisionnement10ème congrès de la société Française de Recherche Opérationnelle et d'Aide à la Décision (ROADEF 2009), Feb 2009, Nancy, France
Communication dans un congrès
emse-00710400v1
|
|
A new batch scheduling problem in machining environment23rd European Conference on Operational Research, Jul 2009, Bonn, Germany
Communication dans un congrès
emse-00673241v1
|
|
|
MRP Offsetting for Assembly Systems with Random Component Delivery Times: A Particular CaseInternational Conference on Advances in Production and Management Systems (APMS), Sep 2009, Paris, France. pp.144-151, ⟨10.1007/978-3-642-16358-6_19⟩
Communication dans un congrès
emse-00676038v1
|
Lotissement et séquencement sur une machine imparfaite avec temps de changement de séries10ème Congrès de la Société Française de Recherche Opérationnelle et Aide à la Décision - ROADEF 2009, Feb 2009, Nancy, France
Communication dans un congrès
hal-00387774v1
|
|
Un algorithme GRASP pour la résolution d'un TLBP avec des contraintes liées aux choix d'équipements10ème congrès de la société Française de Recherche Opérationnelle et d'Aide à la Décision (ROADEF 2009), Feb 2009, Nancy, France
Communication dans un congrès
emse-00710399v1
|
|
A GRASP Heuristic for Sequence-Dependent Transfer Line Balancing Problem13th IFAC Symposium on Information Control Problems in Manufacturing (INCOM09), Jun 2009, Moscou, Russia. p. 766-771, ⟨10.3182/20090603-3-RU-2001.00125⟩
Communication dans un congrès
hal-00673209v1
|
|
Metaheuristic methods for balancing machining transfer lines42nd CIRP Conference on Manufacturing Systems, Jun 2009, Grenoble, France
Communication dans un congrès
hal-01713856v1
|
|
Design of Transfer Lines with Parallel Spindle HeadsIT technologies and Management Conference, Apr 2009, Grodno, Belarus
Communication dans un congrès
emse-00679782v1
|
|
Optimisation of Machining Lines Composed of Unit-built Machines13th IFAC Symposium on Information Control Problems in Manufacturing, Jun 2009, Moscou, Russia. 7p, ⟨10.3182/20090603-3-RU-2001.00200⟩
Communication dans un congrès
emse-00673297v1
|
|
MRP parameterization under lead times uncertainties: Case of multilevel serial production systems39th International Conference on Computers & Industrial Engineering (CIE39), Jul 2009, Troyes, France. p 863 - 868, ⟨10.1109/ICCIE.2009.5223765⟩
Communication dans un congrès
emse-00679211v1
|
|
On the complexity of the dissociation set problems in graphsIFAC Symposium on Control Problems in Manufacturing, 2009, Moscou, Russia. pp.1036 - 1040
Communication dans un congrès
hal-00617113v1
|
|
MRP offsetting for assembly systems under random component delivery timesInternational Conference on Advances in Production Management Systems (APMS2009), Sep 2009, Bordeaux, France. 8 p
Communication dans un congrès
emse-00679181v1
|
|
A Genetic Algorithm Based Approach for Multi-Product Lot-Sizing and Sequencing Problem Under Uncertainties42th CIRP Conference on Manufacturing Systems, Aug 2009, Shanghai, China. 6p
Communication dans un congrès
emse-00679203v1
|
|
Integrated approach for design of machining systems9th IFAC Workshop on Intelligent Manufacturing Systems (IMS'08), Oct 2008, Szczecin, Poland. p. 405-410, ⟨10.3182/20081205-2-CL-4009.00053⟩
Communication dans un congrès
emse-00679266v1
|
|
MIP-based GRASP and Genetic Algorithm for Balancing Transfer LinesSecond international workshop on model based metaheuristics, Jun 2008, Bertinoro, Italy. 22p
Communication dans un congrès
emse-00673272v1
|
|
Control of chaos in agent based manufacturing systemsIEEE International Conference on Emerging Technologies and Factory Automation (ETFA), Sep 2008, Hamburg, Germany. pp.1252-1259, ⟨10.1109/ETFA.2008.4638561⟩
Communication dans un congrès
hal-00355146v1
|
|
Emergent chaotic behaviour in agent based manufacturing systemsWETICE, 17th Int. Workshop on Enabling Technologies: Infrastructures for Collaboratives Enterprises, Jun 2008, Rome, Italy. pp.electronic document, ⟨10.1109/WETICE.2008.42⟩
Communication dans un congrès
hal-00356827v1
|
|
MRP Parameterization under Lead Time Uncertainties: A Branch and Cut Algorithm17th IFAC World Congress, Jul 2008, Séoul, South Korea. p. 12849-12854, ⟨10.3182/20080706-5-KR-1001.02173⟩
Communication dans un congrès
emse-00679101v1
|
|
Planned lead times for one-level assembly system with service level constraintIEEE International Conference on Emerging Technologies and Factory Automation (ETFA), Sep 2008, Hamburg, Germany. pp.1504 - 1511, ⟨10.1109/ETFA.2008.4638594⟩
Communication dans un congrès
hal-00679472v1
|
|
RFID Technology in Supply Chain Management: State of the Art and Perspectives17th IFAC World Congress, Jul 2008, Séoul, South Korea. p. 4464-4475, ⟨10.3182/20080706-5-KR-1001.00753⟩
Communication dans un congrès
emse-00679098v1
|
|
Manufacturing Process Planning for Laser Cutting Robotic Systems17th IFAC World Congress, Jul 2008, Séoul, South Korea. p. 14822-14827, ⟨10.3182/20080706-5-KR-1001.02509⟩
Communication dans un congrès
emse-00679112v1
|
|
Supply planning for two-level assembly systems with stochastic component delivery times: trade-off between holding cost and service levelWorkshop Metaheuristics for Logistics and Vehicle Routing, Oct 2008, Troyes, France. 7 p
Communication dans un congrès
emse-00679262v1
|
|
Détermination des dates d'approvisionnement optimales pour un système d'assemblage à deux niveaux7e conférence internationale francophone de modélisation et simulation (MOSIM'08), Mar 2008, Paris, France. p. 572-581
Communication dans un congrès
emse-00679483v1
|
|
Best Paper Award of IIE Transactions on Design and ManufacturingIIE Annual Conference and Expo 2008, May 2008, Vancouver, British Colombia, Canada
Communication dans un congrès
hal-00387770v1
|
|
MIP-based greedy randomized adaptive search procedure for balancing transfer lines23rd European Conference on Operational Research, Jul 2008, Irkutsk, Russia. pp.174-184
Communication dans un congrès
emse-00673261v1
|
|
A genetic algorithm for replenishment of two-level assembly systems9th IFAC Workshop on Intelligent Manufacturing Systems (IMS'08), Oct 2008, Szczecin, Poland. p. 213-218, ⟨10.3182/20081205-2-CL-4009.00028⟩
Communication dans un congrès
emse-00679461v1
|
|
Planification des réapprovisionnements d'un système d'assemblage à multi-niveau soumis aux aléas des délais d'approvisionnement par un algorithme génétique9ème Congrès de la Société Française de Recherche Opérationnelle et Aide à la Décision - ROADEF 2008, Feb 2008, Clermont-Ferrand, France
Communication dans un congrès
hal-00387772v1
|
|
Une heuristique en deux phases pour l'équilibrage d'une ligne d'usinage avec set-up et machines parallèle9ème Congrès de la Société Française de Recherche Opérationnelle et Aide à la Décision - ROADEF 2008, Feb 2008, Clermont-Ferrand), France
Communication dans un congrès
hal-00387771v1
|
|
An optimization approach for time phasing in MRP systems15th International Working Seminar on Production Economics, Mar 2008, Innsbruck, Austria. Paper220
Communication dans un congrès
emse-00679489v1
|
|
Équilibrage de lignes d'usinage à l'aide de la méthode grasp7e conférence internationale francophone de modélisation et simulation (MOSIM08), Mar 2008, Paris, France
Communication dans un congrès
emse-00673246v1
|
|
A multi-objective approach for transfer line optimization9th IFAC Workshop on Intelligent Manufacturing Systems (IMS'08), Oct 2008, Szczecin, Poland. p. 281-286, ⟨10.3182/20081205-2-CL-4009.00037⟩
Communication dans un congrès
emse-00679451v1
|
|
Survey on flow line balancing problems9th International Conference on the Modern Information Technology in the Innovation Processes of the Industrial Enterprises, Sep 2007, Florence, Italy. pp.269-274
Communication dans un congrès
hal-00387740v1
|
|
Conception de Machines-Outils avec Table Mobile10ème Colloque Nationale AIP-Primeca "Les innnovations en conception de produits et systèmes de production", Oct 2007, La Plagne, France
Communication dans un congrès
hal-00387743v1
|
|
Planification des réapprovisionnements d'un système d'assemblage à deux niveaux soumis aux aléas des délais d'approvisionnement7e congrès de Génie industriel, Jun 2007, Trois-Rivières, Canada
Communication dans un congrès
hal-00387746v1
|
|
Balancing transfer lines with multi-spindles machines using GRASP4th IFAC conference on Management and Control in Manufacturing and Logistics (MCPL), Sep 2007, Sibiu, Romania. pp.511- 516
Communication dans un congrès
hal-00387741v1
|
|
New Reduction Methods For The Transfer Line Balancing ProblemIFAC Workshop On Intelligent Manufacturing Systems (IMS'2007), May 2007, Alicante, Spain. pp.75-80
Communication dans un congrès
hal-00387744v1
|
|
Supply Planning for Multilevel Production Systems with Stochastic Lead Times37th International Conference on Computers & Industrial Engineering, Oct 2007, Alexandria, Egypt. pp.825-834
Communication dans un congrès
hal-00387747v1
|
|
Planification d'une chaîne logistique linéaire multi-niveau soumis aux aléas des délais d'approvisionnementsConférence scientifique conjointe en Recherche Opérationnelle et Aide à la Décision FRANCORO V / ROADEF 2007, Feb 2007, Grenoble, France
Communication dans un congrès
hal-00387769v1
|
|
Balancing Machining Lines with Paralleling of Stations and Sequence-dependent Setup Times37th International Conference on Computers & Industrial Engineering, Oct 2007, Alexandrie, Egypt. pp.2012-2023
Communication dans un congrès
hal-00387738v1
|
|
Operations Research Techniques for Design and Analysis of Lean Manufacturing Systems4th IFAC conference on Management and Control in Manufacturing and Logistics (MCPL), Sep 2007, Sibiu, Romania. pp.11-19, ISBN 978-973-739-481-1
Communication dans un congrès
hal-00387736v1
|
|
Optimisation des transmissions mécaniques complexes avec une structure en réseauxConférence scientifique conjointe en Recherche Opérationnelle et Aide à la Décision FRANCORO V / ROADEF 2007, Feb 2007, Grenoble, France
Communication dans un congrès
hal-00387767v1
|
|
An Improved Mixed Integer Programming Model for a Transfer Line Balancing ProblemInternational Conference on Industrial Engineering and Systems Management (IESM'2007), May 2007, Beijing, China. pp.50
Communication dans un congrès
hal-00387734v1
|
|
Heuristic Methods for a Transfer Line Balancing Problem19th International Conference on Production Research (ICPR-19), Jul 2007, Valparaiso, Chile. pp.ISBN 978-956-310-751-7
Communication dans un congrès
hal-00387745v1
|
|
Mise en place des systèmes de production "lean"workshop international Logistique & Transport 2007 (LT' 2007) a technically IEEE/SMC co-sponsored workshop, Nov 2007, Sousse, Tunisie. pp.241-244
Communication dans un congrès
hal-00387735v1
|
|
Un outil d'aide à la décision pour la conception des systèmes d'usinage5ème conférence Internationale "Conception et Production Intégrées" (CPI 2007), Oct 2007, Rabat, Maroc
Communication dans un congrès
hal-00387742v1
|
|
Modélisation de la configuration des lignes d'usinage avec équipements standardConférence scientifique conjointe en Recherche Opérationnelle et Aide à la Décision FRANCORO V / ROADEF 2007, Feb 2007, Grenoble, France
Communication dans un congrès
hal-00387765v1
|
|
Une méthode exacte pour l'équilibrage de lignes d'usinage avec machines parallèles et changements d'outilsConférence scientifique conjointe en Recherche Opérationnelle et Aide à la Décision FRANCORO V / ROADEF 2007, Feb 2007, Grenoble,, France
Communication dans un congrès
hal-00387768v1
|
|
Configuration des lignes d'usinage avec équipement standard2èmes Journées Nationales MACS, JN-MACS-2007, Jul 2007, Reims, France
Communication dans un congrès
hal-00387766v1
|
|
Optimal Order Release for Multilevel Assembly Systems Under Random Lead Times and Constant Demand19th International Conference on Production Research (ICPR-19), Jul 2007, Valparaiso, Chile. pp.ISBN 978-956-310-751-7
Communication dans un congrès
hal-00387748v1
|
|
A heuristic method for balancing machining lines with paralleling of stations and sequence-dependent setup timesWorkshop International : Logistique & Transport 2007 (LT' 2007) a technically IEEE/SMC co-sponsored workshop, Nov 2007, Sousse, Tunisia. pp.349-354
Communication dans un congrès
hal-00387737v1
|
|
Heuristic Methods to Solve the Alternative Subgraphs Assembly Line Balancing ProblemIEEE Conference on Automation Science and Engineering, Oct 2006, Shangai Pudong, China. pp.513-518, IEEE Catalog Number : 06EX1338C, ISBN : 1-4244-0311-1, ⟨10.1109/COASE.2006.326932⟩
Communication dans un congrès
hal-00387720v1
|
|
Lignes d'usinage avec têtes multi-broches : un nouveau problème d'optimisation6e Conference Francophone de Modélisation et Simulation, Apr 2006, Rabat, France. pp.1250-1259
Communication dans un congrès
hal-00387725v1
|
|
Demand forecasting for multiple slow-moving items with short requests history in case of changeable demand varianceFourteenth International Working Seminar on Production Economics, Feb 2006, Innsbruck, Austria. pp.143-152
Communication dans un congrès
hal-00387726v1
|
|
The Optimal Release Dates in Multilevel Assembly Systems with Random Lead Times36th International Conference on Computers and Industrial Engineering, Jun 2006, Taiwan, Taiwan. pp.1274-1284
Communication dans un congrès
hal-00387729v1
|
|
Demand Forecasting for Multiple Slow-moving Items with Low Consumption and Short Requests History12th IFAC Symposium on Information Control Problems in Manufacturing (INCOM'06), May 2006, Saint-Etienne, France. pp.159-164, ISBN : 978-0-08-044654-7, ⟨10.3182/20060517-3-FR-2903.00098⟩
Communication dans un congrès
hal-00387716v1
|
|
A Comparative Evaluation of Exact and Heurististic Methods for Transfer Line Balancing Problem12th IFAC Symposium on Information Control Problems in Manufacturing (INCOM'06), May 2006, Saint-Etienne, France. pp.395-400, ISBN : 978-0-08-044654-7, ⟨10.3182/20060517-3-FR-2903.00218⟩
Communication dans un congrès
hal-00387717v1
|
|
Conception préliminaire de lignes de transfert avec activation mixte des têtes d'usinage aux stations7ème congrès de la Société Française de Recherche Opérationnelle et d'Aide à la Décision, Feb 2006, Lille, France
Communication dans un congrès
hal-00387758v1
|
|
An Evaluation Study of Approximate Methods for a Line Balancing Problem with Assembly Alternatives8th International Conference on the Modern Information Technology in the Industrial Enterprises, Sep 2006, Budapest, Hungary. pp.199-204, ISBN : 963-86568-57
Communication dans un congrès
hal-00387721v1
|
|
Optimizing Modular Machining Line Design Problem12th IFAC Symposium on Information Control Problems in Manufacturing (INCOM'06), May 2006, Saint-Etienne, France. pp.425-430, ISBN : 978-0-08-044654-7
Communication dans un congrès
hal-00387710v1
|
|
A Model for an Assembly System Under Lead Time Uncertainty12th IFAC Symposium on Information Control Problems in Manufacturing (INCOM'06), May 2006, Saint-Etienne, France. pp.239-244, ISBN : 978-0-08-044654-7, ⟨10.3182/20060517-3-FR-2903.00136⟩
Communication dans un congrès
hal-00387712v1
|
|
A new supply planning model for assembly systemsInternational Conference on Information Systems, Logistics and Supply Chain (ILS'06), May 2006, Lyon, France. pp.1034-1043
Communication dans un congrès
hal-00387733v1
|
|
Optimization in Design of Unit Head Machines with a Mobil Table12th IFAC Symposium on Information Control Problems in Manufacturing (INCOM'06), May 2006, Saint-Etienne, France. pp.413-418, ISBN : 978-0-08-044654-7
Communication dans un congrès
hal-00387715v1
|
|
On complexity of a buffers allocation problem3rd All-Russia Conference "Optimization Problems and Economical Applications", 2006, Omsk, Russia
Communication dans un congrès
emse-00679797v1
|
|
A Comparative Analysis of Heuristic Methods for the Alternative Subgraphs Assembly Line Balancing ProblemXIII Congreso Latino-Iberoamericano de Investigación Operativa (CLAIO), Nov 2006, Montevideo, Uruguay
Communication dans un congrès
hal-00387722v1
|
|
Some Approaches To Balancing Production Lines With Blocks Of Parallel Operations At StationsEURO XXI in Iceland : 21st European Conference on Operational Research, Jul 2006, Reykjavik, Iceland
Communication dans un congrès
hal-00387761v1
|
|
Une méthode hybride pour l'optimisation de lignes d'usinage7ème congrès de la Société Française de Recherche Opérationnelle et d'Aide à la Décision, Feb 2006, Lille, France
Communication dans un congrès
hal-00387759v1
|
|
Genetic Algorithms for Supply Management Problem with Lower-Bounded Demands12th IFAC Symposium on Information Control Problems in Manufacturing (INCOM'06), May 2006, Saint-Etienne, France. pp.521- 526, (Eds.), ISBN : 978-0-08-044654-7
Communication dans un congrès
hal-00387711v1
|
|
"Machine Tools Engineering" : Integrated Decision Support System For The Logical Layout Design Of Unit Head MachinesInternational Conference on Global Manufacturing and Innovation, Jul 2006, Coimbatore, India
Communication dans un congrès
hal-00387724v1
|
|
Zalozenie eksperymentu symulacyjnego w srodowisku laboratorium wirtualnegoBadania operacyjne i systemowe 2006, analiza systemowa w globalnej gospodarce opartej na wiedzy: e-wyzwania, 2006, Warszawa, Poland. p. 383-390
Communication dans un congrès
emse-00679508v1
|
|
An inventory model to supply planning of assembly systemsPreprints of the Fourteenth International Working Seminar on Production Economics, Feb 2006, Innsbruck, Austria
Communication dans un congrès
hal-00387763v1
|
|
Supply Planning in Multilevel Assembly Systems Under Lead Times uncertaintiesInternational Conference on Service Systems and Service Management (ICSSSM'06), Oct 2006, Troyes, France. pp.1014-1019, IEEE Catalog Number : 06EX1406C, ISBN : 1-4244-0451-7, ⟨10.1109/ICSSSM.2006.320783⟩
Communication dans un congrès
hal-00387727v1
|
|
A Supply Planning Model for Multilevel Assembly Systems Under Random Lead Times11th IEEE International Conference on Emerging Technologies and Factory Automation, Sep 2006, Prague, Czech Republic. pp.1348-1351, IEEE Catalog Number : 06TH8897C, ISBN : 1-4244-0681-1, ⟨10.1109/ETFA.2006.355246⟩
Communication dans un congrès
hal-00387728v1
|
|
Optimal Release Dates in Multiperiod and Multilevel Supply Chain with Random Lead TimesInternational Mediterranean Modelling Multiconference (I3M'2006), Oct 2006, Barcelone, Spain. pp.75-82, ISBN : 84-690-0726-2
Communication dans un congrès
hal-00387730v1
|
|
Quadratic Assignment Problem : Easily Solvable Cases12th IFAC Symposium on Information Control Problems in Manufacturing (INCOM'06), May 2006, Saint-Etienne, France. pp.441-446, ISBN : 978-0-08-044654-7
Communication dans un congrès
hal-00387714v1
|
|
Exact Methods for Design of Unit-Head MachinesECCO XIX - CO 2006 Joint Meeting, May 2006, Porto, Portugal
Communication dans un congrès
hal-00387760v1
|
|
Balancing Paced Production Lines with Block of Parallel Operations at Stations17th Triennial Conference of the International Federation of Operational Research Societies (IFORS), Jul 2005, Hawai, United States
Communication dans un congrès
hal-00387751v1
|
|
Robust Bayesian Forecasting for Inventory Management of Slow-Moving ItemsInternational Conference on Agility (ICAM 2005), Jul 2005, Otaniemi, Finland. pp.105-113
Communication dans un congrès
hal-00387698v1
|
|
Mixed model for transfer lines with multi-spindles stations : an optimization algorithm10th IEEE International Conference on Emerging Technologies and Factory Automation, Sep 2005, France. pp.467-474
Communication dans un congrès
hal-00387692v1
|
|
Constrained mixed graph coloringsThe European Chapter on Combinatorial Optimization ECCO XVIII 'Combinatorics for modern manufacturing, logistics and supply chains', May 2005, Minsk, Belarus
Communication dans un congrès
hal-00387752v1
|
|
Un exemple d'application des méthodes de la RO pour l'optimisation des transmissions mécaniques6ème Congrès de la Société Française de Recherche Opérationnelle et d'Aide à la Décision (ROADEF'05), Feb 2005, Tours, France
Communication dans un congrès
hal-00387755v1
|
|
A random search and backtraking procedure for transfer line balancingIESM'05 Conference, May 2005, Marrakech, Morocco. pp.ISBN 2- 9600532-0-6
Communication dans un congrès
hal-00387704v1
|
|
Bayesian Approach to Modelling of Quasi-Periodic Intermittent Demand16th IFAC World Congress, Jul 2005, Prague, Czech Republic
Communication dans un congrès
hal-00387703v1
|
|
A stochastic model for operating room planning with elective and emergency surgery demands, OR for Health Policy: Making better decisionThe 31th International Conference on Operational Research Applied to Health Services (ORAHS'2007), Jul 2005, Southampton, United Kingdom
Communication dans un congrès
emse-00679796v1
|
|
A new model for transfer line with simultaneous activation of multi-spindle heads at workstations35th International Conference on Computer and Industrial Engineering, Jun 2005, Istanbul, Turkey
Communication dans un congrès
hal-00387697v1
|
|
Deux méthodes d'optimisation multicritère pour l'aide à la conception d'une ligne de production6ème Congrès International de Génie Industriel, Jun 2005, Besançon, France
Communication dans un congrès
hal-00387701v1
|
|
MIP Models for Transfer Line Balancing: A Comparison.5th International Conference Research and Development in Mechanical Industry (RaDMI 2005), Sep 2005, Vrnjacka Banja, 10 p
Communication dans un congrès
emse-00679514v1
|
|
A combined heuristic approach for optimization of a class of machining lines2005 IEEE International Conference on Automation Science and Engineering, Aug 2005, Edmonton, Canada. pp.154-159, ⟨10.1109/COASE.2005.1506761⟩
Communication dans un congrès
hal-00387694v1
|
|
|
Machining lines with multi-spindle workstations: a new optimization problem10th IEEE Conference on Emerging Technologies and Factory Automation, 2005. (ETFA 2005), Sep 2005, Catania, Italy. 8 pp. - 474, ⟨10.1109/ETFA.2005.1612561⟩
Communication dans un congrès
emse-00679525v1
|
MIP Optimisation for Large-Scale Transfer Line Balancing Problems using Decomposition18th International Conference on Production Research (ICPR-18), Jul 2005, Fisciano, Italy. pp.ISBN 88-87030-96-0
Communication dans un congrès
hal-00387696v1
|
|
Manufacturing Process Planning for Robotic Arc-Welding Station with Positioning Table6th IEEE International Symposium on Assembly and Task Planning, Jul 2005, Montréal, Canada. pp.ISBN : 0-7803-9080-6, ⟨10.1109/ISATP.2005.1511441⟩
Communication dans un congrès
hal-00387699v1
|
|
Conception des machines-outils : prototype d'un système d'aide à la decisionJournées Doctorales et Nationales du GDR MACS : JDMACS-JNMACS 2005, Sep 2005, Lyon, France
Communication dans un congrès
hal-00387709v1
|
|
A combined optimization approach for machining transfer lines with blocks of operationsThe European Chapter on Combinatorial Optimization ECCO XVIII 'Combinatorics for modern manufacturing, logistics and supply chains', May 2005, Minsk, Belarus
Communication dans un congrès
hal-00387753v1
|
|
Un programme linéaire pour la conception des lignes de transfert à partir d'un ensemble fixe de têtes d'usinage6ème Congrès de la Société Française de Recherche Opérationnelle et d'Aide à la Décision (ROADEF'05), Feb 2005, tours, France. pp.259-275
Communication dans un congrès
hal-00387787v1
|
|
Exact and Heuristic Algorithms for Optimization of Transfer Lines with Multi-Spindle Stations17th Triennial Conference of the International Federation of Operational Research Societies (IFORS), Jul 2005, Hawai, United States
Communication dans un congrès
hal-00387750v1
|
|
High Quality Lower Bound for a Generalized Transfer Line Balancing Problem18th International Conference on Production Research (ICPR-18), Jul 2005, Fisciano, Italy. pp.ISBN : 88-87030-96-0
Communication dans un congrès
hal-00387695v1
|
|
Transfer Line Balancing by A Combined Approach16th IFAC World Congress, Jul 2005, Prague, Czech Republic. ⟨10.3182/20050703-6-CZ-1902.01468⟩
Communication dans un congrès
hal-00387702v1
|
|
Heuristic algorithm for scheduling and commercial management of TV stationsThe European Chapter on Combinatorial Optimization ECCO XVIII 'Combinatorics for modern manufacturing, logistics and supply chains', May 2005, Minsk, Belarus
Communication dans un congrès
hal-00387754v1
|
|
Reconfigurable Transfer Lines Cost Optimization - A Linear Programming Approach10th IEEE International Conference on Emerging Technologies and Factory Automation (ETFA 2005), Sep 2005, Catania, Italy. pp.625-632, ⟨10.1109/ETFA.2005.1612581⟩
Communication dans un congrès
hal-00387693v1
|
|
Quelques approches pour la minimisation du coût des lignes de transfert5e Conférence Francophone de MOdélisation et SIMulation "Modélisation et simulation pour l'analyse et l'optimisation des systèmes industriels et logistiques", Sep 2004, Nantes, France. p. 677-684
Communication dans un congrès
emse-00704955v1
|
|
|
Forecasting risk analysis for supply chains with intermittent demandInternational Workshop Performance and Risk Measurement: Operations, Logistics and Supply Chains, Dec 2004, Milan, Italy. pp.339-348, ⟨10.1504/IJRAM.2008.019741⟩
Communication dans un congrès
emse-00704780v1
|
Optimal design of machines decicated to a given set of jobs2nd International Workshop on Discrete Optimisation Methods in Production and Logistics, Jul 2004, Omsk, Russia. p. 33-38
Communication dans un congrès
emse-00705038v1
|
|
Graph approach for design of unit-head machines with a rotary table2nd International Workshop on Discrete Optimisation Methods in Production and Logistics, Jul 2004, Omsk, Russia. p. 114-119
Communication dans un congrès
emse-00705064v1
|
|
Decomposition approach for transfer line life cycle cost optimisationSecond International Workshop on "Discrete Optimization Methods in Production and Logistics" - DOM'2004, Jul 2004, Omsk, Russia. p160
Communication dans un congrès
emse-00709862v1
|
|
Modeling Demand For Inventory Management Of Slow-Moving Items in Case of Reporting ErrorsIFAC Symposium Information Control Problems in Manufacturing (INCOM'04), Apr 2004, Salvador da Bahia, Brazil. p. 27-31
Communication dans un congrès
emse-00708771v1
|
|
Modelling And Monitoring of Correlated Faults in Redundant Computer Control SystemsInternational conference on Intelligent Maintenance systems (IMS'04), Jul 2004, Arles, France. pp.1-6
Communication dans un congrès
emse-00704972v1
|
|
Optimal Motion Planning of Cooperative Mobile Robots in 2d EnvironmentsConference Management and Control of Production and Logistics MCPL'04, Nov 2004, Santiago, Chile. p. 131-136
Communication dans un congrès
emse-00704888v1
|
|
Une Approche de plus court chemin pour l'optimisation des machines-outils5e Conférence Francophone de MOdélisation et SIMulation "Modélisation et simulation pour l'analyse et l'optimisation des systèmes industriels et logistiques", Sep 2004, Nantes, France. p. 259-266
Communication dans un congrès
emse-00704942v1
|
|
Balancing of Transfer Lines with Simultaneously Activated SpindlesIFAC Symposium Information Control Problems in Manufacturing (INCOM'04), Apr 2004, Salvador da Bahia, Brazil. p. 45-50
Communication dans un congrès
emse-00708765v1
|
|
Optimisation des machines d'usinage et des lignes de transfertQuatrièmes journées francophones de recherche opérationnelle FRANCORO 2004, Aug 2004, Fribourg, Suisse. p47-48
Communication dans un congrès
emse-00709850v1
|
|
Branch and Bound Algorithm for a Transfer Lines Balancing ProblemConference Management and Control of Production and Logistics MCPL'04, Nov 2004, Santiago, Chile. p. 327-332
Communication dans un congrès
emse-00704885v1
|
|
Une PSE pour l'optimisation de la Planification des réapprovisionnements des systèmes d'assemblage5e Conférence Francophone de MOdélisation et SIMulation "Modélisation et simulation pour l'analyse et l'optimisation des systèmes industriels et logistiques", Sep 2004, Nantes, France. p. 387-394
Communication dans un congrès
emse-00704929v1
|
|
Heuristic Algorithms for Balancing Transfer Lines with Simultaneously Activated SpindlesWorkshop on Manufacturing Modelling, Management and Control MIM04, Oct 2004, Greece. p. 173 - 178
Communication dans un congrès
emse-00704772v1
|
|
A Hybrid Algorithm for Buffers Allocation in Tandem Production Lines with Unreliable Machines2nd International Workshop on Discrete Optimisation Methods in Production and Logistics, Jul 2004, Omsk, Russia. p. 39-44
Communication dans un congrès
emse-00705023v1
|
|
Generalized Beta-Binomial Model for Group Correlated Binary DataInternational Workshop on Biometric Technologies (BT'2004), Jun 2004, Calgary, Canada. p. 115-124
Communication dans un congrès
emse-00708691v1
|
|
Organization of the modeling and simulation of the discrete processesACS-CISIM 2004, Jun 2004, Bialystok, Poland. pp.319-327, ISBN : 83-87256-67-6
Communication dans un congrès
hal-00387700v1
|
|
Optimization of transfer line by constraint programming approach34th International Conference on Computer and Industrial Engineering, Nov 2004, San Francisco, United States. p. 357-362
Communication dans un congrès
emse-00704725v1
|
|
Designing machines for a given volumes and types of jobsMechanics of Machines : Theory and Applications, Feb 2003, Minsk, Belarus. p. 132-140
Communication dans un congrès
emse-00705080v1
|
|
Graph Approach for Transfer Lines Balancing: Exact and Heuristic Methods3rd International Conference Research and Development in Mechanical Industry (RaDMI 2003), Sep 2003, Herceg Novi, 10 p
Communication dans un congrès
emse-00710143v1
|
|
Neural Network Technique For Collision Free Trajectory Syntheses For Robotic ManipulatorsIFAC International Conference on Intelligent Control Systems and Signal Processing, Apr 2003, France. p. 529-534
Communication dans un congrès
emse-00710522v1
|
|
An algorithm for the MRP parameterization under uncertaintyInternational Conference on Industrial Engineering and Production Management (IEPM'03), May 2003, Porto, Portugal. pp. 374-383
Communication dans un congrès
emse-00710169v1
|
|
Minimisation of equipment cost for transfer lines with blocks of parallel tasks2003 IEEE International Symposium on Assembly and Task Planning (ISATP'03), Jul 2003, Besançon, France. pp. 109-114, ⟨10.1109/ISATP.2003.1217196⟩
Communication dans un congrès
emse-00710105v1
|
|
Synergy, collaboration and self-balancing in production systems - the Bucket brigadesIFAC International Workshop on Intelligent Assembly and Disassembly (IAD), Oct 2003, Bucharest, Romania. pp.61-66
Communication dans un congrès
emse-00710088v1
|
|
Utilisation d'un algorithme de plus court chemin pour l'optimisation des lignes de transfert5ème Congrès de la société française de Recherche Operationnelle et d'Aide à la décision (ROADEF 2003), Feb 2003, Avignon, France
Communication dans un congrès
emse-00720886v1
|
|
Mathematical models and methods for balancing production lines with parallel blocks of operations at workstations18th International Symposium on Mathematical Programming, Aug 2003, France. p. 58
Communication dans un congrès
emse-00710562v1
|
|
A branch and bound algorithm for supply planningIEEE/IMACS Multi-conference Computational Engineering in Systems Applications (CESA'2003), Jul 2003, Lille, France. 5 p
Communication dans un congrès
emse-00710179v1
|
|
Lignes auto-équilibrées : nouveau concept, analyse et modélisation4ème Colloque Francophone sur la Modélisation des Systèmes Réactifs - MSR 2003, Oct 2003, Metz, France. pp. 195-209
Communication dans un congrès
emse-00709974v1
|
|
On some heuristic algorithms for buffers allocation problemOptimisation problems in economics, Jul 2003, Omsk, Russia. p. 85
Communication dans un congrès
emse-00712998v1
|
|
Equipment Cost Minimization for Transfer Line with Blocks of Parallel OperationsInternational Conference on Industrial Engineering and Production Management (IEPM'03), May 2003, Porto, Portugal. p. 412- 421
Communication dans un congrès
emse-00710175v1
|
|
Structuration des lignes de transfert à l'étape de leur conception préliminaire5th International Industrial Engineering Conference "Industrial Engineering and the New Global Challenges", Oct 2003, Quebec, Canada. 10 p
Communication dans un congrès
emse-00710309v1
|
|
Balancing production lines composed by series of workstations with parallel operations blocks2003 IEEE International Symposium on Assembly and Task Planning (ISATP'03), Jul 2003, Besançon, France. pp. 122 - 127, ⟨10.1109/ISATP.2003.1217198⟩
Communication dans un congrès
emse-00710124v1
|
|
Some Optimization Approaches for Transfer Lines with Blocks of Parallel Operations7th IFAC Symposium on Intelligent Manufacturing Systems, Apr 2003, Budapest, Hungary. pp. 261-266
Communication dans un congrès
emse-00710135v1
|
|
Une relaxation du modèle normatif des lignes de production auto-équilibrées ("Bucket Brigades")Quatrième Conférence Francophone de Modélisation et Simulation "Organisation et Conduite d'Activités dans l'Industrie et les Services" (MOSIM'03), Apr 2003, Toulouse, France. pp. 262-269
Communication dans un congrès
emse-00710115v1
|
|
A polynomial algorithm for the MPS parameterization under uncertainty15th IFAC World Congress, Jul 2002, Barcelone, Spain. p. 19-24, ⟨10.3182/20020721-6-ES-1901.00491⟩
Communication dans un congrès
emse-00708728v1
|
|
Balancing and Optimal Cost Resource Planning of Production lines with blocks of Parallel Tasks1st CIRP, Seminar on Digital Enterprise Technology, Sep 2002, Durham, United Kingdom
Communication dans un congrès
hal-02798694v1
|
|
Optimal control of robotic manipulator for laser cutting applications15th IFAC World Congress, Jul 2002, Barcelone, Spain. 6p, ⟨10.3182/20020721-6-ES-1901.00967⟩
Communication dans un congrès
emse-00708710v1
|
|
Optimal design of transfer lines with blocks of parallel operations15th IFAC World Congress, Jul 2002, Barcelone, Spain. p. 7-12, ⟨10.3182/20020721-6-ES-1901.00004⟩
Communication dans un congrès
emse-00708721v1
|
|
Assembly line design: A survey15th IFAC World Congress, Jul 2002, Barcelone, Spain. p. 155-166, ⟨10.3182/20020721-6-ES-1901.01647⟩
Communication dans un congrès
emse-00708730v1
|
|
Discrete Event Simulation Model for Performances Analysis in an Industrial Case Study13th European Simulation Symposium, 2001, Marseille, France. pp.270-271
Communication dans un congrès
hal-02082015v1
|
|
Modélisation et optimisation des stocks de rechanges d’un système industriel réparti12e Colloque National de Fiabilité & Maintenabilité - λμ12, Institut pour la maîtrise des risques - IMDR, Mar 2000, Montpellier, France. pp.B8.3
Communication dans un congrès
hal-03088674v1
|
Impact of Additive Manufacturing on Supply Chain Resilience During COVID-19 PandemicSupply Network Dynamics and Control, 20, Springer International Publishing, pp.121-146, 2022, Springer Series in Supply Chain Management, ⟨10.1007/978-3-031-09179-7_6⟩
Chapitre d'ouvrage
hal-03981894v1
|
|
Expected trends in production networks for mass personalization in the cloud technology eraDesign and Operation of Production Networks for Mass Personalization in the Era of Cloud Technology, Elsevier, pp.13-37, 2022, ⟨10.1016/B978-0-12-823657-4.00003-8⟩
Chapitre d'ouvrage
hal-03982113v1
|
|
Introduction to Supply Network Dynamics and ControlSupply Network Dynamics and Control, 20, Springer International Publishing, pp.1-10, 2022, Springer Series in Supply Chain Management, 978-3-031-09179-7. ⟨10.1007/978-3-031-09179-7_1⟩
Chapitre d'ouvrage
hal-03981902v1
|
|
|
Multi-objective Approach and Model for Transfer Line ReconfigurationsLyes Benyoucef. Reconfigurable Manufacturing Systems: From the Design to Implementation, Springer, pp.193-208, 2020, Springer Series in Advanced Manufacturing, 978-3-030-28784-9. ⟨10.1007/978-3-030-28782-5_10⟩
Chapitre d'ouvrage
hal-03170898v1
|
Sustainable and Energy Efficient Reconfigurable Manufacturing SystemsReconfigurable Manufacturing Systems: From Design to Implementation, Springer International Publishing, pp.179-191, 2020, Springer Series in Advanced Manufacturing, ⟨10.1007/978-3-030-28782-5_9⟩
Chapitre d'ouvrage
hal-03613417v1
|
|
Introduction to Scheduling in Industry 4.0 and Cloud Manufacturing SystemsScheduling in Industry 4.0 and Cloud Manufacturing, pp.1-9, 2020, ⟨10.1007/978-3-030-43177-8_1⟩
Chapitre d'ouvrage
hal-03170855v1
|
|
Sustainable and Energy Efficient Reconfigurable Manufacturing SystemsLyes Benyoucef. Reconfigurable Manufacturing Systems: From Design to Implementation, Springer, Cham, pp.179-191, 2020, Reconfigurable Manufacturing Systems: From Design to Implementation. Springer Series in Advanced Manufacturing, ⟨10.1007/978-3-030-28782-5_9⟩
Chapitre d'ouvrage
emse-02277938v1
|
|
Analysis of the Scalability for Different Configurations of LinesLyes Benyoucef. Reconfigurable Manufacturing Systems: From Design to Implementation, Springer, Cham, pp.139-160, 2020, Springer Series in Advanced Manufacturing, ⟨10.1007/978-3-030-28782-5_7⟩
Chapitre d'ouvrage
emse-02333715v1
|
|
Proactive Scheduling and Reactive Real-Time Control in Industry 4.0Scheduling in Industry 4.0 and Cloud Manufacturing, pp.11-37, 2020, ⟨10.1007/978-3-030-43177-8_2⟩
Chapitre d'ouvrage
hal-03170889v1
|
|
Multi-objective Approach and Model for Transfer Line Reconfigurations.Reconfigurable Manufacturing Systems: From Design to Implementation, 2019
Chapitre d'ouvrage
hal-03422311v1
|
|
Digital Supply Chain Twins: Managing the Ripple Effect, Resilience, and Disruption Risks by Data-Driven Optimization, Simulation, and VisibilityHandbook of Ripple Effects in the Supply Chain, pp.309-332, 2019, 978-3-030-14301-5. ⟨10.1007/978-3-030-14302-2_15⟩
Chapitre d'ouvrage
hal-02434349v1
|
|
Sustainable and Energy Efficient Reconfigurable Manufacturing SystemsReconfigurable Manufacturing Systems: From Design to Implementation, 2019
Chapitre d'ouvrage
hal-03422312v1
|
|
Ripple Effect in the Supply Chain: Definitions, Frameworks and Future Research PerspectivesHandbook of Ripple Effects in the Supply Chain, Springer, pp.1-34, 2019, 978-3-030-14301-5
Chapitre d'ouvrage
hal-02435957v1
|
|
Complexity of Bi-objective Buffer Allocation Problem in Systems with Simple StructureOptimization Problems and Their Applications, 871, Springer, pp.278-287, 2018, Communications in Computer and Information Science, 978-3-319-93799-1
Chapitre d'ouvrage
hal-01977539v1
|
|
Simulation vs optimization approaches to ripple effect modelling in the supply chain, Chapter 5Dynamics in Logistics, Freitag M., Kotzab H., Pannek J. (eds), LDIC 2018, Lecture Notes in Logistics (LNL), Springer, 2018
Chapitre d'ouvrage
hal-01719522v1
|
|
Optimization Approaches for Multi-level Assembly Systems Under Stochastic Lead TimesEl-Ghazali Talbi, Farouk Yalaoui, Lionel Amodeo. Metaheuristics for Production Systems, 60, Springer International Publishing, pp 93-107, 2015, Operations Research/Computer Science Interfaces Series, 978-3-319-23349-9. ⟨10.1007/978-3-319-23350-5_4⟩
Chapitre d'ouvrage
emse-01250864v1
|
|
Robust Assembly Line Balancing: State of the Art and New Research PerspectivesSequencing and Scheduling with Inaccurate Data, Nova Science Publishers, Chapter 9, p. 211-223, 2014, 978-1-62948-677-2
Chapitre d'ouvrage
emse-00880985v1
|
|
Multi-objective Approaches for Design of Assembly LinesLyes Benyoucef; Jean-Claude Hennet; Manoj Kumar Tiwari. Applications of Multi-Criteria and Game Theory Approaches : Manufacturing and Logistics, Springer London, pp 31-56, 2014, Springer Series in Advanced Manufacturing, ⟨10.1007/978-1-4471-5295-8_2⟩
Chapitre d'ouvrage
emse-00880905v1
|
|
|
A Stochastic Formulation of the Disassembly Line Balancing ProblemAdvances in Production Management Systems. Competitive Manufacturing for Innovative Products and Services, pp.397-404, 2013, ⟨10.1007/978-3-642-40352-1_50⟩
Chapitre d'ouvrage
hal-01963453v1
|
Reconfiguration of Machining Transfer LinesTheodor Borangiu; Andre Thomas; Damien Trentesaux. Service Orientation in Holonic and Multi Agent Manufacturing and Robotics, Springer Berlin Heidelberg, pp 339-353, 2013, Studies in Computational Intelligence, ⟨10.1007/978-3-642-35852-4_22⟩
Chapitre d'ouvrage
emse-00794556v1
|
|
Chance Constrained Programming Model for Stochastic Profit–Oriented Disassembly Line Balancing in the Presence of Hazardous PartsAdvances in Production Management Systems. Sustainable Production and Service Supply Chains, pp.103-110, 2013
Chapitre d'ouvrage
hal-01963445v1
|
|
MIP-based GRASP and Genetic Algorithm for Balancing Transfer LinesManiezzo, Vittorio; Stützle, Thomas; Voß, Stefan. Matheuristics, Springer US, pp.189-208, 2010, ⟨10.1007/978-1-4419-1306-7_7⟩
Chapitre d'ouvrage
emse-00673081v1
|
|
Decision Making and Support Tools for Design of Machining SystemsStrategic Information Systems: Concepts, Methodologies, Tools, and Applications, IGI Global, pp.591-603, 2010, ⟨10.4018/978-1-60566-677-8.ch039⟩
Chapitre d'ouvrage
emse-00673095v1
|
|
Supply Chain Management under Uncertainties: Lot-sizing and Scheduling RulesBenyoucef, Lyes; Grabot, Bernard. Artificial Intelligence Techniques for Networked Manufacturing Enterprises Management, Springer, 510 p, 2010, Springer Series in Advanced Manufacturing
Chapitre d'ouvrage
emse-00673738v1
|
|
Beta-Binomial Model and Its Generalizations in the Demand Forecasting for Multiple Slow-Moving ItemsJ.J. Zhu and G.P.C. Fung. Forecasting Models - Methods and Applications, iConcept Press Ltd, Chapter 2, 2010
Chapitre d'ouvrage
emse-00675806v1
|
|
Machining Lines AutomationNof, Shimon Y. Springer Handbook of Automation, Springer Berlin Heidelberg, chapitre 35, p. 599 - 617, 2009, ⟨10.1007/978-3-540-78831-7_35⟩
Chapitre d'ouvrage
emse-00710495v1
|
|
A View of SME Clusters and Networks in Europe : Poles of Competitiveness in FranceVilla A. & Antonelli D. A Road Map to the Developmenet of European SME Networks Towards Collaborative Innovation, Springer, pp. 23 - 60, 2009, 978-1-84800-342-2. ⟨10.1007/978-1-84800-342-2_2⟩
Chapitre d'ouvrage
hal-00405026v1
|
|
A View of SME Clusters and Networks in EuropeA. Villa and D. Antonelli. A Road Map to the Development of European SME Networks : Towards a Collaborative Innovation, Springer London, pp.23-60, 2009, ⟨10.1007/978-1-84800-342-2_2⟩
Chapitre d'ouvrage
hal-00387794v1
|
|
Decision Making and Support Tools for Design of Machining SystemsEncyclopedia of Decision Making and Decision Support Technologies, IGI Global, p. 155-164, 2008, ⟨10.4018/978-1-59904-843-7.ch018⟩
Chapitre d'ouvrage
emse-00673102v1
|
|
Parameterization of MRP for Supply Planning Under Uncertainties of Lead TimesV. Kordic (Ed.). Supply Chain, I-Tech Education and Publishing, p. 247-262, ISBN 978-3-902613-22-6, 2008
Chapitre d'ouvrage
emse-00675814v1
|
|
Lot-Sizing and Sequencing on a Single Imperfect MachineLe Thi, Hoai: Bouvry, Pascal: Pham Dinh, Tao. Modelling, Computation and Optimization in Information Systems and Management Sciences, Springer Berlin Heidelberg, p 117 - 125, 2008, ⟨10.1007/978-3-540-87477-5_13⟩
Chapitre d'ouvrage
emse-00679088v1
|
|
Decision Making and Support Tools for Design of Transmission SystemsF. Adam and P. Humphreys. Encyclopedia of Decision Making and Decision Support Technologies, Idea Group Inc., pp.165-175, 2008, vol n°1
Chapitre d'ouvrage
hal-00387793v1
|
|
Decision-Making and Support Tools for Design of Transmission SystemsEncyclopedia of Decision Making and Decision Support Technologies, IGI Global, p. 165-175, 2008, ⟨10.4018/978-1-59904-843-7.ch019⟩
Chapitre d'ouvrage
emse-00673104v1
|
|
|
Kinematic Control of a Robot-Positioner System for Arc Welding ApplicationKin-Huat Low. Industrial Robotics: Programming, Simulation and Applications, pp.293-314, 2007, Industrial Robotics: Programming, Simulation and Applications, 978-3-86611-286-6. ⟨10.5772/4903⟩
Chapitre d'ouvrage
hal-00387790v1
|
Modular Machining Line Design and Reconfiguration: Some Optimization MethodsV. Kordic, A. Lazinica, M. Merdan. Manufacturing the Future, pro literatur Verlag, p. 125-152, ISBN: 3-86611-198-3, 2006
Chapitre d'ouvrage
emse-00675849v1
|
|
Stability of optimal line balance with given station setSupply chain optimisation : product/process design, facilities location and flow control, Springer, pp.135-149, 2005, Applied Optimization, vol. 94
Chapitre d'ouvrage
hal-00387785v1
|
|
Organization of the modeling and simulation of the discrete processesSaeed, Khalid; Pejaś, Jerzy. Information Processing and Security Systems, Springer US, p. 443 - 452, 2005, ⟨10.1007/0-387-26325-X_40⟩
Chapitre d'ouvrage
hal-00675855v1
|
|
A survey on supply planning under uncertainties in MRP environmentsP. Horacek, M. Simandl, and P. Zitek. Selected Plenaries, Milestones and Surveys, IFAC, pp.228-239, 2005, ⟨10.3182/20050703-6-CZ-1902.01426⟩
Chapitre d'ouvrage
hal-00387784v1
|
|
Consumer behavior robust modellingSupply chain optimisation : product/process design, facilities location and flow control, Springer, pp.55-70, 2005, Applied Optimization, vol. 94
Chapitre d'ouvrage
hal-00387786v1
|
|
Learning the capacity consumption of lot-sizing models from production schedules2024
Pré-publication, Document de travail
hal-04505043v1
|
Supplier replacement model in a one-level assembly system under lead-time uncertainty2020
Pré-publication, Document de travail
hal-02523659v1
|